2024 Vol. 7, No. 3
Article Contents

Er-yong Zhang, Dong-guang Wen, Gui-ling Wang, Xian-peng Jin, Lin-you Zhang, Hai-dong Wu, Wen-shi Wang, Cheng-ming Ye, Wei Weng, Kuan Li, Jin-sheng Wu, Xian-chun Tang, Chong-yuan Zhang, Qing-da Feng, Sheng Lian, Li-sha Hu, Gui-lin Zhu, Xing-long Xie, Bin Wu, Dan Wang, Xue Niu, Zhao-xuan Niu, Dong-lin Liu, Hui Zhang, Wen-hao Xu, Shu-qing Yao, Li Yang, 2024. Two stages power generation test of the hot dry rock exploration and production demonstration project in the Gonghe Basin, northeastern Qinghai-Tibet plateau, China, China Geology, 7, 409-421. doi: 10.31035/cg2024082
Citation: Er-yong Zhang, Dong-guang Wen, Gui-ling Wang, Xian-peng Jin, Lin-you Zhang, Hai-dong Wu, Wen-shi Wang, Cheng-ming Ye, Wei Weng, Kuan Li, Jin-sheng Wu, Xian-chun Tang, Chong-yuan Zhang, Qing-da Feng, Sheng Lian, Li-sha Hu, Gui-lin Zhu, Xing-long Xie, Bin Wu, Dan Wang, Xue Niu, Zhao-xuan Niu, Dong-lin Liu, Hui Zhang, Wen-hao Xu, Shu-qing Yao, Li Yang, 2024. Two stages power generation test of the hot dry rock exploration and production demonstration project in the Gonghe Basin, northeastern Qinghai-Tibet plateau, China, China Geology, 7, 409-421. doi: 10.31035/cg2024082

Two stages power generation test of the hot dry rock exploration and production demonstration project in the Gonghe Basin, northeastern Qinghai-Tibet plateau, China

More Information
  • The Hot Dry Rock (HDR) is considered as a clean and renewable energy, poised to significantly contribute to the global energy decarbonization agenda. Many HDR projects worldwide have accumulated valuable experience in efficient drilling and completion, reservoir construction, and fracture simulation. In 2019, China Geological Survey (CGS) initiated a demonstration project of HDR exploration and production in the Gonghe Basin, aiming to overcome the setbacks faced by HDR projects. Over the ensuing four years, the Gonghe HDR project achieved the first power generation in 2021, followed by the second power generation test in 2022. After establishing the primary well group in the initial phase, two directional wells and one branch well were drilled. Noteworthy progress was made in successfully constructing the targeted reservoir, realizing inter-well connectivity, power generation and grid connection, implementing of the real-time micro-seismic monitoring. A closed-loop technical validation of the HDR exploration and production was completed. However, many technical challenges remain in the process of HDR industrialization, such as reservoir fracture network characterization, efficient drilling and completion, multiple fracturing treatment, continuous injection and production, as well as mitigation of induced seismicity and numerical simulation technology.

  • 加载中
  • Ayling BF, Hogarth RA, Rose PE. 2016. Tracer testing at the Habanero EGS site, central Australia. Geothermics, 63, 15–26. doi: 10.1016/j.geothermics.2015.03.008.

    CrossRef Google Scholar

    Baisch S, Weidler, R, Vrs R, Wyborn D, Graaf LD. 2006. Induced Seismicity during the Stimulation of a geothermal HFR Reservoir in the Cooper Basin, Australia. Bulletin of the Seismological Society of America. 96 (6), 2242–2256. doi:10.1785/0120050255.

    Google Scholar

    Bruno MS, Detwiler RL, Lao K, White A, Elkhoury JE. 2012. Advanced Horizontal Well Recirculation Systems for Geothermal Energy Recovery in Sedimentary and Crystalline Formations. Office of Scientific and Technical Information Technical Reports. doi:10.2172/1057293.

    Google Scholar

    Cladouhos TT, Petty S, Swyer MW, Uddenberg ME, Grasso K, Nordin Y. 2016. Results from Newberry Volcano EGS Demonstration, 2010–2014. Geothermics, 63(Sep.), 44–61. doi: 10.1016/j.geothermics.2015.08.009.

    CrossRef Google Scholar

    Feng YF, Zhang XX, Zhang B, Liu, JT, Wang YG, Jia DL, Hao LR, Kong ZY. 2018. The geothermal formation mechanism in the Gonghe basin: Discussion and analysis from the geological background. China Geology, 1(3), 331–345. doi: 10.31035/cg2018043.

    CrossRef Google Scholar