Zhengzhou Institute of Multipurpose Utilization of Mineral Resources, Chinese Academy of Geological SciencesHost
2021 Vol. 41, No. 3
Article Contents

YU Chunmei, WANG Ling, ZHANG Qing, MA Baozhong, FU Xin, WANG Chengyan. Process Mineralogy Study on Hard Lump Forming in Copper Smelting Flue of ISA Furnace[J]. Conservation and Utilization of Mineral Resources, 2021, 41(3): 43-48. doi: 10.13779/j.cnki.issn1001-0076.2021.03.006
Citation: YU Chunmei, WANG Ling, ZHANG Qing, MA Baozhong, FU Xin, WANG Chengyan. Process Mineralogy Study on Hard Lump Forming in Copper Smelting Flue of ISA Furnace[J]. Conservation and Utilization of Mineral Resources, 2021, 41(3): 43-48. doi: 10.13779/j.cnki.issn1001-0076.2021.03.006

Process Mineralogy Study on Hard Lump Forming in Copper Smelting Flue of ISA Furnace

More Information
  • During the process of copper smelting in Isa furnace, the scraper was worn badly due to hard lump formed in flue, and the flue gas circulation was blocked, which affected the production efficiency and stability. In this paper, from the perspective of process mineralogy, the occurrence state of copper, iron, sulfur and other main elements from the residual heat boiler flue products of the Isa furnace, as well as the mineral phase composition and structure characteristics of hard lump were examined. And the factors leading to the formation of hard lump in flue were analyzed. The results show that the content of copper ferrite, hematite, magnetite, matte and silicate glass phase in hard lump is obviously high. And these mineral phases often adhere and cement copper sulfate in the form of nuclei to form slags with relatively high hardness, which was related to the strong splashing of slag and matte during smelting. Due to the high temperature and oxygen content of the flue gas flow, the slagging continues to grow accompanied by repeated adhesion and secondary reactions. According to the research results, the slagging problem in the flue can be effectively improved by controlling the flow of the spray gun and the negative pressure in the furnace, appropriately reducing the temperature of the dust and expanding the diameter of the vertical flue.

  • 加载中
  • [1] 易光明, 李熹. 艾萨炉在铜冶炼过程中的应用[J]. 有色金属文摘, 2016, 31(1): 141-142.

    Google Scholar

    [2] 付江, 王华. 艾萨熔池熔炼的应用与优化[J]. 工业加热, 2007(1): 35-40.

    Google Scholar

    [3] 张鑫, 惠兴欢, 朱江, 沈强华. 控制艾萨炉余热锅炉过渡段结渣的生产实践[J]. 中国有色冶金, 2013, 42(3): 12-14+18.

    Google Scholar

    [4] 赵璧, 李发彪, 葸军, 张宇云. 艾萨铜熔炼高温段烟道结渣处理[J]. 世界有色金属, 2019(8): 19-20.

    Google Scholar

    [5] 杨毓和. 控制艾萨炉余热锅炉结渣探讨[J]. 中国有色冶金, 2007(5): 19-22.

    Google Scholar

  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Figures(8)

Tables(1)

Article Metrics

Article views(1072) PDF downloads(56) Cited by(0)

Access History

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint