TAN Chengxuan, ZHANG Peng, WANG Jiming, FENG Chengjun, QI Bangshen, WANG Huiqing, LI Bin, CHEN Qunce, WU Manlu, SUN Weifeng, QIN Xianghui, ZHANG Chongyuan. 2023. Considerations on the application of in-situ stress measurement and real-time monitoring in deep underground engineering in strong tectonic activity region. Journal of Geomechanics, 29(6): 757-769. doi: 10.12090/j.issn.1006-6616.2023122
Citation: TAN Chengxuan, ZHANG Peng, WANG Jiming, FENG Chengjun, QI Bangshen, WANG Huiqing, LI Bin, CHEN Qunce, WU Manlu, SUN Weifeng, QIN Xianghui, ZHANG Chongyuan. 2023. Considerations on the application of in-situ stress measurement and real-time monitoring in deep underground engineering in strong tectonic activity region. Journal of Geomechanics, 29(6): 757-769. doi: 10.12090/j.issn.1006-6616.2023122

Considerations on the application of in-situ stress measurement and real-time monitoring in deep underground engineering in strong tectonic activity region

    Fund Project: This research is financially supported by the Geological Survey Projects of the China Geological Survey (Grants No. DD20160267, DD20190317, and DD20221738)
More Information
  • The concentration, complexity, and significant anisotropy of in-situ stress make it a pressing and challenging issue in engineering geology safety in strong tectonic activity areas. This paper firstly analyzes the application and existing problems of in-situ stress measurement in deep-buried underground engineering in strong tectonic activity areas. Then, it focuses on the application method, technology, and roles of real-time in-situ stress monitoring in deep underground engineering within tectonically active regions. Finally, it discusses the problems that need to be considered in the application of in-situ stress measurement and real-time monitoring. The results show that in the strong tectonic activity area, relying solely on limited deep hole in-situ stress measurements to determine overall stress design parameters for deep underground engineering is inadequate. A comprehensive study of the three-dimensional in-situ stress field is necessary to reveal its spatial distribution characteristics. Different in-situ stress design parameters should be used for different positions of the deep-buried underground project to avoid engineering waste or engineering damages caused by large or small in-situ stress design parameters. In the strong tectonic activity area, the disk core density is inversely proportional to the measured magnitude of the in-situ stress, and the depth range that has yet to form in the cake-shaped core often has the highest in-situ stress and the most concentrated stress, and the deep underground engineering should avoid this depth range. While a major earthquake or major engineering geological problem occurs, real-time monitoring of in-situ stress can dynamically reveal the relative change trend and evolution process of the in-situ stress magnitude of a specific structural site. It can calculate the absolute value of the in-situ stress state in different time domains during the real-time monitoring period without carrying out new absolute in-situ stress measurements. Regional crust stability and deep-buried engineering geological safety risks can be quickly evaluated, and quantitative in-situ stress design parameters and the stress-strain reserved threshold for preventing deformation and breaking can be provided for the damage repair of deep-buried engineering and the risk of fault activity can also be assessed. The research results will offer geological security for the planning, construction, and safe operation and maintenance of major projects in strong tectonic activity areas.

  • 加载中
  • [1] BAI S W, LI G Y, 1982. Research on stress field around dam area of Ertan hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering, 1(1): 45-56. (in Chinese with English abstract)

    Google Scholar

    [2] CHEN C J, LIU Z X, LIU J Y, 2016. Study on deformation and failure characteristics of surrounding rock of Jinping Class I hydropower station under high geostress conditions[J]. Design of Hydroelectric Power Station, 32(3): 5-10, 64. (in Chinese)

    Google Scholar

    [3] CHENG H, ZHANG G X, LIAO J X, et al. , 2020. Analysis on characteristics and influencing factors of valley deformation of high arch dam[J]. Water Resources and Hydropower Engineering, 51(5): 65-70. (in Chinese with English abstract)

    Google Scholar

    [4] FAN Y L, TAN C X, ZHANG P, et al. , 2020. A study of current in-situ stress state and its influence on tectonic stability in the Xiongan New Area[J]. Acta Geoscientica Sinica, 41(4): 481-491. (in Chinese with English abstract)

    Google Scholar

    [5] FAN Y L, ZHANG P, GAO Y, et al. , 2021. Study of in-situ stress state and tectonic stability of Liyang seismic area in the Yangtze River Delta region[J]. Progress in Geophysics, 36(5): 1842-1852. (in Chinese with English abstract)

    Google Scholar

    [6] FAN Y L, FENG C J, ZHANG P, et al. , 2022a. Impact of Tohoku-Oki 3.11 M9.0 earthquake on the fault slip potential of the active Quaternary faults in Beijing city: new insights from in situ stress monitoring data[J]. Sensors, 22(13): 4888. doi: 10.3390/s22134888

    CrossRef Google Scholar

    [7] FAN Y L, ZHANG P, FENG C J, et al. , 2022b. Analysis of fault slip potential of active faults in Tangshan seismic region after the Tohoku-Oki 3.11 M9.0 earthquake based on in situ stress monitoring data[J]. Frontiers in Earth Science, 10: 970595. doi: 10.3389/feart.2022.970595

    CrossRef Google Scholar

    [8] FENG C J, ZHANG P, SUN W F, et al. , 2014. The application of in situ stress measuring and real-time monitoring results to analyzing the fault activity hazard at Ming tombs borehole in Changping District, Beijing[J]. Acta Geoscientica Sinica, 35(3): 345-354. (in Chinese with English abstract)

    Google Scholar

    [9] GAO K J, ZHAO W G, WANG R K, et al. , 2018. Influence of valley contraction on deformation and stress state of high arch dam[J]. Science Technology and Engineering, 18(16): 92-100. (in Chinese with English abstract)

    Google Scholar

    [10] GUO C B, ZHANG Y S, JIANG L W, et al. , 2017. Discussion on the environmental and engineering geological problems along the Sichuan-Xizang railway and its adjacent area[J]. Geoscience, 31(5): 877-889. (in Chinese with English abstract)

    Google Scholar

    [11] GUO Q L, WU F Q, QIAN W P, et al. , 2006. Study on relationship between deformation of surrounding rock and in-situ stress in Wushaoling deep-buried railway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 25(11): 2194-2199. (in Chinese with English abstract)

    Google Scholar

    [12] GUO Q L, WANG C H, MA H S, et al. , 2009. In-situ hydro-fracture stress measurement before and after the Wenchuan Ms8.0 earthquake of China[J]. Chinese Journal of Geophysics, 52(5): 1395-1401. (in Chinese with English abstract)

    Google Scholar

    [13] HOEK E, BROWN E T, 1997. Practical estimates of rock mass strength[J]. International Journal of Rock Mechanics and Mining Sciences, 34(8): 1165-1186. doi: 10.1016/S1365-1609(97)80069-X

    CrossRef Google Scholar

    [14] HOEK E, MARINOS P, BENISSI M, 1998. Applicability of the geological strength index (GSI) classification for very weak and sheared rock masses. The case of the Athens schist formation[J]. Bulletin of Engineering Geology and the Environment, 57(2): 151-160. doi: 10.1007/s100640050031

    CrossRef Google Scholar

    [15] HUANG S L, DING X L, LIAO C G, et al. , 2014. Initial 3D geostress field recognition of high geostress field at deep valley region and considerations on underground powerhouse layout[J]. Chinese Journal of Rock Mechanics and Engineering, 33(11): 2210-2224. (in Chinese with English abstract)

    Google Scholar

    [16] LI G L, LI N, DING Y J, 2020. Research on key prevention and control technologies for large-deformation high geostress soft rock tunnel[J]. China Railway(12): 69-73. (in Chinese with English abstract)

    Google Scholar

    [17] LI H, AN Q M, WANG H Z, et al. , 2006. Study on in-situ stress measurement in V-shaped river valley[J]. Chinese Journal of Rock Mechanics and Engineering, 25(S1): 3069-3073. (in Chinese with English abstract)

    Google Scholar

    [18] LIANG K, HE Z T, JIANG W L, et al. , 2022. Surface rupture characteristics of the Menyuan Ms6.9 earthquake on January 8, 2022, Qinghai Province[J]. Seismology and Geology, 44(1): 256-278. (in Chinese with English abstract)

    Google Scholar

    [19] LIAO C T, SHI Z X, 1983. In-situ stress measurements and their application to engineering design in the Jinchuan mine[J]. Chinese Journal of Rock Mechanics and Engineering, 2(1): 103-112. (in Chinese with English abstract)

    Google Scholar

    [20] LIAO C T, ZHANG C S, WU M L, et al. , 2003. Stress change near the Kunlun fault before and after the Ms 8.1 Kunlun earthquake[J]. Geophysical Research Letters, 30(20): 2027.

    Google Scholar

    [21] LIN W R, SAITO S, SANADA Y, et al. , 2011. Principal horizontal stress orientations prior to the 2011 Mw 9.0 Tohoku-Oki, Japan, earthquake in its source area[J]. Geophysical Research Letters, 38(7): L00G10.

    Google Scholar

    [22] LIN W R, CONIN M, MOORE J C, et al. , 2013. Stress state in the largest displacement area of the 2011 Tohoku-Oki earthquake[J]. Science, 339(6120): 687-690. doi: 10.1126/science.1229379

    CrossRef Google Scholar

    [23] LIU G, ZHANG F Y, LI X Z, et al. , 2005. Research on large deformation and its mechanism of Muzhailing tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 24(S2): 5521-5526. (in Chinese with English abstract)

    Google Scholar

    [24] MARTIN C D, KAISER P K, CHRISTIANSSON R, 2003. Stress, instability and design of underground excavations[J]. International Journal of Rock Mechanics and Mining Sciences, 40(7-8): 1027-1047. doi: 10.1016/S1365-1609(03)00110-2

    CrossRef Google Scholar

    [25] PENG J B, CUI P, ZHUANG J Q, 2020. Challenges to engineering geology of Sichuan-Xizang railway[J]. Chinese Journal of Rock Mechanics and Engineering, 39(12): 2377-2389. (in Chinese with English abstract)

    Google Scholar

    [26] QIN X H, TAN C X, SUN J Z, et al. , 2012. Experimental study of relation between in-situ crustal stress and rock elastic modulus[J]. Rock and Soil Mechanics, 33(6): 1689-1695. (in Chinese with English abstract)

    Google Scholar

    [27] QIN X H, CHEN Q C, MENG W, et al. , 2023. Determination of the current in-situ stress field of the Tongmai-Bomi section in the northern margin of the eastern Himalayan syntaxis[J]. Acta Geologica Sinica, 97(7): 2126-2140. (in Chinese with English abstract)

    Google Scholar

    [28] QIU Z H, 2010. A review of component borehole observation of stress-strain in China[J]. Journal of Geodesy and Geodynamics, 30(5): 42-47. (in Chinese with English abstract)

    Google Scholar

    [29] SHEOREY P R, 1994. A theory for in situ stresses in isotropic and transverseley isotropic rock[J]. International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 31(1): 23-34.

    Google Scholar

    [30] SONG S W, FENG X M, LIAO C G, et al. , 2016. Measures for controlling large deformations of underground caverns under high in-situ stress condition-A case study of Jinping I hydropower station[J]. Journal of Rock Mechanics and Geotechnical Engineering, 8(5): 605-618. doi: 10.1016/j.jrmge.2016.06.002

    CrossRef Google Scholar

    [31] SUN W F, GUO C B, ZHANG G Z, et al. , 2021. In-situ stress measurement of Guodashan tunnel horizontal borehole in West Sichuan and the engineering significance[J]. Geoscience, 35(1): 126-136. (in Chinese with English abstract)

    Google Scholar

    [32] SUN X M, ZHAO C W, TAO Z G, et al. , 2021. Failure mechanism and control technology of large deformation for Muzhailing Tunnel in stratified rock masses[J]. Bulletin of Engineering Geology and the Environment, 80(6): 4731-4750. doi: 10.1007/s10064-021-02222-5

    CrossRef Google Scholar

    [33] SUN Y C, XIN M G, WANG Y, et al. ,2022. Measurement and Regression Analysis of the Tunnel Geostress of a Heavy Haul Railway. Railway Investigation and Surveying, 48(1): 16-20, 44. (in Chinese with English abstract)

    Google Scholar

    [34] TAN C X, SUN Y, WANG L J, 2003. Some problems of in-situ crustal stress measurements[J]. Journal of Geomechanics, 9(3): 275-280, 260. (in Chinese with English abstract)

    Google Scholar

    [35] TAN C X, WANG R J, Sun Y, et al. , 2004. Numerical modelling estimation of the ‘tectonic stress plane’ (TSP) beneath topography with quasi-U-shaped valleys[J]. International Journal of Rock Mechanics and Mining Sciences, 41(2): 303-310. doi: 10.1016/S1365-1609(03)00096-0

    CrossRef Google Scholar

    [36] TAN C X, SHI L, SUN W F, et al. , 2004. Research on tectonic stress plane[J]. Chinese Journal of Rock Mechanics and Engineering, 23(23): 3970-3978. (in Chinese with English abstract)

    Google Scholar

    [37] TAN C X, SUN W F, SUN Y, et al. , 2006. A consideration on in-situ crustal stress measuring and its underground engineering application[J]. Acta Geologica Sinica, 80(10): 1627-1632. (in Chinese with English abstract)

    Google Scholar

    [38] TAN C X, ZHANG P, ZHEN H H, et al. , 2008. An analysis on in-situ crustal stress measurements and major engineering geology issues at the dam site area of Jinping first stage hydropower station[J]. Journal of Engineering Geology, 16(2): 162-168. (in Chinese with English abstract)

    Google Scholar

    [39] TAN C X, ZHANG P, FENG C J, et al. , 2014. An approach to deep borehole crustal stress measuring and real-time monitoring and its application in seismogeology research in capital Beijing region[J]. Acta Geologica Sinica, 88(8): 1436-1452. (in Chinese with English abstract)

    Google Scholar

    [40] TAN C X, HU Q Y, ZHANG P, et al. , 2015. Present tectonic stress adjustment process before and after Japan Mw9.0 earthquake in North and Northeast China and its research significance[J]. Earth Science Frontiers, 22(1): 345-359. (in Chinese with English abstract)

    Google Scholar

    [41] TAN C X, ZHANG P, LU S L, et al. , 2019. Significance and role of in-situ crustal stress measuring and real-time monitoring in earthquake prediction research[J]. Journal of Geomechanics, 25(5): 866-876. (in Chinese with English abstract)

    Google Scholar

    [42] TAN C X, YANG W M, ZHANG C S, et al. , 2020. Study on active structure and regional crustal stability in Beijing-Tianjin-Hebei Collaborative Development Area[M]. Beijing: Geological Publishing House. (in Chinese)

    Google Scholar

    [43] TANG H, LI T B, MENG L B, et al. , 2015. Back analysis of ground-stress field for Erlangshan deep buried tunnel on Sichuan-Xizang railway[J]. Railway Engineering(3): 65-69. (in Chinese with English abstract)

    Google Scholar

    [44] WANG C H, GUO Q L, DING L F, et al. , 2009. High in-situ stress criteria for engineering area and a case analysis[J]. Rock and Soil Mechanics, 30(8): 2359-2364. (in Chinese with English abstract)

    Google Scholar

    [45] WANG C H, GUO Q L, JIA L, 2011a. Theoretical analysis of high stress criterion based on the Hoek-Brown criterion[J]. Rock and Soil Mechanics, 32(11): 3325-3332. (in Chinese with English abstract)

    Google Scholar

    [46] WANG C H, ZHANG Y S, GUO Q L et al. , 2011b. New integrated analysis method to analyze stress regime of engineering area[J]. Chinese Journal of Geotechnical Engineering, 33(10): 1562-1568. (in Chinese with English abstract)

    Google Scholar

    [47] WANG C H, XING B R, CHEN Y Q, 2014. Prediction of stress field of super-long deep-buried tunnel area and case analysis[J]. Chinese Journal of Geotechnical Engineering, 36(5): 955-960. (in Chinese with English abstract)

    Google Scholar

    [48] WANG C H, GAO G Y, YANG S X et al. , 2019. Analysis and prediction of stress fields of Sichuan—Xizang railway area based on contemporary tectonic stress field zoning in western China[J]. Chinese Journal of Rock Mechanics and Engineering, 38(11): 2242-2253. (in Chinese with English abstract)

    Google Scholar

    [49] WANG D, LI T B, JIANG L W, et al. , 2017. Analysis of the stress characteristics and rock burst of ultra deep buried tunnel in Sichuan-Xizang railway[J]. Journal of Railway Engineering Society, 34(4): 46-50. (in Chinese with English abstract)

    Google Scholar

    [50] WANG L J, PAN L Z, LIAO C T, et al. , 1991. In-situ stress measurement and its application in engineering[M]. Beijing: Geological Publishing House. (in Chinese)

    Google Scholar

    [51] WANG Q W, JU N P, HUANG J, et al. , 2016. Regression analysis of initial geostress field of Sangzhuling super-long tunnel[J]. Science Technology and Engineering, 16(25): 137-143. (in Chinese with English abstract)

    Google Scholar

    [52] WANG Q W, JU N P, DU L L, et al. , 2018. Three dimensional inverse analysis of geostress field in the Sangri–Jiacha section of Lasa–Linzhi railway[J]. Rock and Soil Mechanics, 39(4): 1450-1462. (in Chinese with English abstract)

    Google Scholar

    [53] WEI P , REN X H, JIAO H X, et al. Study on optimization inversion of initial in-situ stress field within slate area [ J] . Water Resources and Hydropower Engineering, 2022, 53(1): 190- 198. (in Chinese with English abstract)

    Google Scholar

    [54] WU M L, MA Y, LIAO C T, et al. , 2008. Study on recent state of stress in depth 1 000 m of Jinchuan mine[J]. Chinese Journal of Rock Mechanics and Engineering, 27(S2): 3785-3790. (in Chinese with English abstract)

    Google Scholar

    [55] XU A, QUAN X J, WANG B, et al. ,2022.Inverse Analysis of the Initial Stress Field in High Ground Stress Soft and Hard Rock Tunnels[J]. Railway Standard Design, 66(8): 137-142..(in Chinese with English abstract)

    Google Scholar

    [56] XUE S Y, XIE H, YUAN D Y, et al. , 2022. Seismic disaster characteristics of the surface rupture of Menyuan MS6.9 earthquake in 2022[J]. China Earthquake Engineering Journal, 44(2): 458-467. (in Chinese with English abstract)

    Google Scholar

    [57] XUE Y G, KONG F M, YANG W M, et al. , 2020. Main unfavorable geological conditions and engineering geological problems along Sichuan-Xizang railway[J]. Chinese Journal of Rock Mechanics and Engineering, 39(3): 445-468. (in Chinese with English abstract)

    Google Scholar

    [58] YAN J, HE C, WANG B, et al. , 2019. Inoculation and characters of rockbursts in extra-long and deep-lying tunnels located on Yarlung Zangbo suture[J]. Chinese Journal of Rock Mechanics and Engineering, 38(4): 769-781. (in Chinese with English abstract)

    Google Scholar

    [59] YANG J X, HUANG S L, LIU Z X, 2019. Relationship between deformation failure and strength-to-stress ratio of surrounding rock of large-scale underground hard rock caverns under high geo-stress[J]. Journal of Yangtze River Scientific Research Institute, 36(2): 63-70. (in Chinese with English abstract)

    Google Scholar

    [60] YANG Q, PAN Y W, CHENG L, et al. , 2015. Mechanism of valley deformation of high arch dam and effective stress principle for unsaturated fractured rock mass[J]. Chinese Journal of Rock Mechanics and Engineering, 34(11): 2258-2269. (in Chinese with English abstract)

    Google Scholar

    [61] ZHANG B, CHENG H H, SHI Y L, 2015. Calculation of the co-seismic effect of MS8.1 earthquake, April 25, 2015, Nepal[J]. Chinese Journal of Geophysics, 58(5): 1794-1803. (in Chinese with English abstract)

    Google Scholar

    [62] ZHANG C Y, WU M L, LIAO C T, 2013. In-situ stress measurement and study of stress state characteristics of Jinchuan No. 3 mine[J]. Rock and Soil Mechanics, 34(11): 3254-3260. (in Chinese with English abstract)

    Google Scholar

    [63] ZHANG C Y, DU S H, HE M C, et al. , 2022. Characteristics of in-situ stresses on the western margin of the eastern Himalayan syntaxis and its influence on stability of tunnel surrounding rock[J]. Chinese Journal of Rock Mechanics and Engineering, 41(5): 954-967. (in Chinese with English abstract)

    Google Scholar

    [64] ZHANG G Z, JIA Z Q, FENG J, et al. , 2022. Definition for dual-index high geostress and classification standard for rock burst and large deformation in railway tunnels[J]. Journal of Railway Engineering Society, 39(8): 53-58, 65. (in Chinese with English abstract)

    Google Scholar

    [65] ZHANG P, SUN Z G, WANG Q N, et al. , 2017a. In-situ stress measurement and stability analysis of surrounding rocks in the north section of deep buried tunnel in Muzhailing[J]. Journal of Geomechanics, 23(6): 893-903. (in Chinese with English abstract)

    Google Scholar

    [66] ZHANG P, QU Y M, GUO C B, et al. , 2017b. Analysis of in-situ stress measurement and real-time monitoring results in Nyching of Xizang plateau and its response to Nepal MS8.1 earthquake[J]. Geoscience, 31(5): 900-910. (in Chinese with English abstract)

    Google Scholar

    [67] ZHANG W X, ZHANG J G, TANG S W, et al. , 2013. Ground stress characteristics and their influence on tunnel deformation: case study on Muzhailing tunnel[J]. Tunnel Construction, 33(2): 116-121. (in Chinese with English abstract)

    Google Scholar

    [68] ZHANG Y, XIAO P X, DING X L, et al. , 2012. Study of deformation and failure characteristics for surrounding rocks of underground powerhouse caverns under high geostress condition and countermeasures[J]. Chinese Journal of Rock Mechanics and Engineering, 31(2): 228-244. (in Chinese with English abstract)

    Google Scholar

    [69] ZHANG Y X. 2021. Characteristics of current in-situ stress field about Sejila mountain traffic corridor[J]. Journal of Engineering Geology, 29(2): 394-403. (in Chinese with English abstract)

    Google Scholar

    [70] ZHANG Y F, YUAN K, ZHOU W J, et al. , 2023. Study on structural deformation characteristics and surface crack distribution of girder tunnel across Lenglongling fault caused by Menyuan earthquake[J]. Chinese Journal of Rock Mechanics and Engineering, 42(5): 1055-1069. (in Chinese with English abstract)

    Google Scholar

    [71] ZHU S, ZHAN W, LIANG H B, et al. , 2022. Coseismic deformation characteristics before the Menyuan, Qinghai M 6.9 earthquake from GNSS observation data[J]. China Earthquake Engineering Journal, 44(2): 370-379. (in Chinese with English abstract)

    Google Scholar

    [72] ZOU X M, ZHONG J F, CHEN Z, et al , 2022. Numerical simulation method-based study on causation of sudden change of seismicity after impoundment of Xiluodu Reservoir [J]. Water Resources and Hydropower Engineering, 53( 10) : 186-19

    Google Scholar

    [73] 白世伟, 李光煜, 1982. 二滩水电站坝区岩体应力场研究[J]. 岩石力学与工程学报, 1(1): 45-56.

    Google Scholar

    [74] 陈长江, 刘忠绪, 刘建友, 2016. 高地应力条件下锦屏一级水电站地下厂房围岩变形破坏特征研究[J]. 水电站设计, 32(3): 5-10, 64. doi: 10.3969/j.issn.1003-9805.2016.03.002

    CrossRef Google Scholar

    [75] 程恒, 张国新, 廖建新, 等, 2020. 高拱坝谷幅变形特征及影响因素分析[J]. 水利水电技术, 51(5): 65-70.

    Google Scholar

    [76] 范玉璐, 谭成轩, 张鹏, 等, 2020. 雄安新区现今地应力环境及其对构造稳定性影响研究[J]. 地球学报, 41(4): 481-491. doi: 10.3975/cagsb.2020.040603

    CrossRef Google Scholar

    [77] 范玉璐, 张鹏, 高研, 等, 2021. 长三角溧阳震区地应力环境及构造稳定性分析[J]. 地球物理学进展, 36(2): 1842-1852. doi: 10.6038/pg2021EE0368

    CrossRef Google Scholar

    [78] 丰成君, 张鹏, 孙炜锋, 等, 2014. 北京昌平十三陵钻孔地应力测量与实时监测在断层活动危险性分析中的应用探讨[J]. 地球学报, 35(3): 345-354. doi: 10.3975/cagsb.2014.03.10

    CrossRef Google Scholar

    [79] 高克静, 赵文光, 王仁坤, 等, 2018. 谷幅收缩对高拱坝变形及应力状态的影响[J]. 科学技术与工程, 18(16): 92-100. doi: 10.3969/j.issn.1671-1815.2018.16.015

    CrossRef Google Scholar

    [80] 郭长宝, 张永双, 蒋良文, 等, 2017. 川藏铁路沿线及邻区环境工程地质问题概论[J]. 现代地质, 31(5): 877-889. doi: 10.3969/j.issn.1000-8527.2017.05.001

    CrossRef Google Scholar

    [81] 郭啟良, 伍法权, 钱卫平, 等, 2006. 乌鞘岭长大深埋隧道围岩变形与地应力关系的研究[J]. 岩石力学与工程学报, 25(11): 2194-2199. doi: 10.3321/j.issn:1000-6915.2006.11.005

    CrossRef Google Scholar

    [82] 郭啟良, 王成虎, 马洪生, 等, 2009. 汶川Ms8.0级大震前后的水压致裂原地应力测量[J]. 地球物理学报, 52(5): 1395-1401.

    Google Scholar

    [83] 黄书岭, 丁秀丽, 廖成刚, 等, 2014. 深切河谷区水电站厂址初始应力场规律研究及对地下厂房布置的思考[J]. 岩石力学与工程学报, 33(11): 2210-2224. doi: 10.13722/j.cnki.jrme.2014.11.006

    CrossRef Google Scholar

    [84] 李国良, 李宁, 丁彦杰, 2020. 高地应力软岩大变形隧道防控关键技术研究[J]. 中国铁路(12): 69-73.

    Google Scholar

    [85] 李宏, 安其美, 王海忠, 等, 2006. V型河谷区原地应力测量研究[J]. 岩石力学与工程学报, 25(S1): 3069-3073.

    Google Scholar

    [86] 梁宽, 何仲太, 姜文亮, 等, 2022. 2022年1月8日青海门源Ms6.9地震的同震地表破裂特征[J]. 地震地质, 44(1): 256-278.

    Google Scholar

    [87] 廖椿庭, 施兆贤, 1983. 金川矿区原岩应力实测及在矿山设计中的应用[J]. 岩石力学与工程学报, 2(1): 103-112.

    Google Scholar

    [88] 刘高, 张帆宇, 李新召, 等, 2005. 木寨岭隧道大变形特征及机理分析[J]. 岩石力学与工程学报, 24(S2): 5521-5526.

    Google Scholar

    [89] 彭建兵, 崔鹏, 庄建琦, 2020. 川藏铁路对工程地质提出的挑战[J]. 岩石力学与工程学报, 39(12): 2377-2389. doi: 10.13722/j.cnki.jrme.2020.0446

    CrossRef Google Scholar

    [90] 秦向辉, 谭成轩, 孙进忠, 等, 2012. 地应力与岩石弹性模量关系试验研究[J]. 岩土力学, 33(6): 1689-1695. doi: 10.16285/j.rsm.2012.06.005

    CrossRef Google Scholar

    [91] 秦向辉, 陈群策, 孟文, 等, 2023. 喜马拉雅东构造结北缘通麦-波密段现今地应力场特征研究[J]. 地质学报, 97(7): 2126-2140.

    Google Scholar

    [92] 邱泽华, 2010. 中国分量钻孔地应力-应变观测发展重要事件回顾[J]. 大地测量与地球动力学, 30(5): 42-47.

    Google Scholar

    [93] 孙炜锋, 郭长宝, 张广泽, 等, 2021. 川西郭达山隧道水平孔地应力测量与工程意义[J]. 现代地质, 35(1): 126-136.

    Google Scholar

    [94] 孙元春, 辛明高, 汪洋, 等, 2022.某重载铁路隧道地应力测试与反演分析. 铁道勘察, 48(1): 16-20, 44.

    Google Scholar

    [95] 谭成轩, 孙叶, 王连捷, 2003. 地应力测量值得注意的若干问题[J]. 地质力学学报, 9(3): 275-280, 260. doi: 10.3969/j.issn.1006-6616.2003.03.010

    CrossRef Google Scholar

    [96] 谭成轩, 石玲, 孙炜锋, 等, 2004. 构造应力面研究[J]. 岩石力学与工程学报, 23(23): 3970-3978. doi: 10.3321/j.issn:1000-6915.2004.23.010

    CrossRef Google Scholar

    [97] 谭成轩, 孙炜锋, 孙叶, 等, 2006. 地应力测量及其地下工程应用的思考[J]. 地质学报, 80(10): 1627-1632. doi: 10.3321/j.issn:0001-5717.2006.10.018

    CrossRef Google Scholar

    [98] 谭成轩, 张鹏, 郑汉淮, 等, 2008. 雅砻江锦屏一级水电站坝址区实测地应力与重大工程地质问题分析[J]. 工程地质学报, 16(2): 162-168. doi: 10.3969/j.issn.1004-9665.2008.02.003

    CrossRef Google Scholar

    [99] 谭成轩, 张鹏, 丰成君, 等, 2014. 探索首都圈地区深孔地应力测量与实时监测及其在地震地质研究中应用[J]. 地质学报, 88(8): 1436-1452. doi: 10.19762/j.cnki.dizhixuebao.2014.08.006

    CrossRef Google Scholar

    [100] 谭成轩, 胡秋韵, 张鹏, 等, 2015. 日本Mw9.0级大地震前后华北和东北地区现今构造应力作用调整过程与研究意义探讨[J]. 地学前缘, 22(1): 345-359.

    Google Scholar

    [101] 谭成轩, 张鹏, 路士龙, 等, 2019. 原位地应力测量与实时监测在地震预报研究中的作用和意义[J]. 地质力学学报, 25(5): 866-876. doi: 10.12090/j.issn.1006-6616.2019.25.05.071

    CrossRef Google Scholar

    [102] 谭成轩, 杨为民, 张春山, 等, 2020. 京津冀协同发展区活动构造与区域地壳稳定性研究[M]. 北京: 地质出版社.

    Google Scholar

    [103] 唐浩, 李天斌, 孟陆波, 等, 2015. 川藏铁路二郎山深埋隧道的地应力场反演分析[J]. 铁道建筑(3): 65-69.

    Google Scholar

    [104] 王成虎, 郭啟良, 丁立丰, 等, 2009. 工程区高地应力判据研究及实例分析[J]. 岩土力学, 30(8): 2359-2364. doi: 10.3969/j.issn.1000-7598.2009.08.029

    CrossRef Google Scholar

    [105] 王成虎, 郭啟良, 贾龙, 2011a. 基于Hoek-Brown强度准则的高应力判据理论分析[J]. 岩土力学, 32(11): 3325-3332.

    Google Scholar

    [106] 王成虎, 张彦山, 郭啟良, 等, 2011b. 工程区地应力场的综合分析法研究[J]. 岩土工程学报, 33(10): 1562-1568.

    Google Scholar

    [107] 王成虎, 邢博瑞, 陈永前, 2014. 长大深埋隧道工程区地应力状态预测与实例分析[J]. 岩土工程学报, 36(5): 955-960. doi: 10.11779/CJGE201405021

    CrossRef Google Scholar

    [108] 王成虎, 高桂云, 杨树新, 等, 2019. 基于中国西部构造应力分区的川藏铁路沿线地应力的状态分析与预估[J]. 岩石力学与工程学报, 38(11): 2242-2253.

    Google Scholar

    [109] 王栋, 李天斌, 蒋良文, 等, 2017. 川藏铁路某超深埋隧道地应力特征及岩爆分析[J]. 铁道工程学报, 34(4): 46-50.

    Google Scholar

    [110] 王连捷, 潘立宙, 廖椿庭, 等, 1991. 地应力测量及其在工程中的应用[M]. 北京: 地质出版社.

    Google Scholar

    [111] 王庆武, 巨能攀, 黄健, 等, 2016. 桑珠岭特长隧道初始地应力场反演分析[J]. 科学技术与工程, 16(25): 137-143. doi: 10.3969/j.issn.1671-1815.2016.25.023

    CrossRef Google Scholar

    [112] 王庆武, 巨能攀, 杜玲丽, 等, 2018. 拉林铁路桑日至加查段三维地应力场反演分析[J]. 岩土力学, 39(4): 1450-1462.

    Google Scholar

    [113] 魏鹏, 任旭华, 焦红星, 等. 板岩区初始地应力场优化反演研究[J]. 水利水电技术(中英文) , 2022, 53(1): 190-198.

    Google Scholar

    [114] 吴满路, 马宇, 廖椿庭, 等, 2008. 金川二矿深部1 000 m中段地应力测量及应力状态研究[J]. 岩石力学与工程学报, 27(S2): 3785-3790.

    Google Scholar

    [115] 徐安, 全晓娟, 汪波, 等. 2022. 高地应力软硬岩隧道初始应力场反演分析. 铁道标准设计, 66(8): 137-142.

    Google Scholar

    [116] 薛善余, 谢虹, 袁道阳, 等, 2022. 2022门源MS6.9地震地表破裂带震害特征调查[J]. 地震工程学报, 44(2): 458-467.

    Google Scholar

    [117] 薛翊国, 孔凡猛, 杨为民, 等, 2020. 川藏铁路沿线主要不良地质条件与工程地质问题[J]. 岩石力学与工程学报, 39(3): 445-468.

    Google Scholar

    [118] 严健, 何川, 汪波, 等, 2019. 雅鲁藏布江缝合带深埋长大隧道群岩爆孕育及特征[J]. 岩石力学与工程学报, 38(4): 769-781.

    Google Scholar

    [119] 杨静熙, 黄书岭, 刘忠绪, 2019. 高地应力硬岩大型洞室群围岩变形破坏与岩石强度应力比关系研究[J]. 长江科学院院报, 36(2): 63-70.

    Google Scholar

    [120] 杨强, 潘元炜, 程立, 等, 2015. 高拱坝谷幅变形机制及非饱和裂隙岩体有效应力原理研究[J]. 岩石力学与工程学报, 34(11): 2258-2269.

    Google Scholar

    [121] 张贝, 程惠红, 石耀霖, 2015. 2015年4月25日尼泊尔MS8.1大地震的同震效应[J]. 地球物理学报, 58(5): 1794-1803.

    Google Scholar

    [122] 张重远, 吴满路, 廖椿庭, 2013. 金川三矿地应力测量及应力状态特征研究[J]. 岩土力学, 34(11): 3254-3260. doi: 10.16285/j.rsm.2013.11.029

    CrossRef Google Scholar

    [123] 张重远, 杜世回, 何满潮, 等, 2022. 喜马拉雅东构造结西缘地应力特征及其对隧道围岩稳定性的影响[J]. 岩石力学与工程学报, 41(5): 954-967. doi: 10.13722/j.cnki.jrme.2021.0502

    CrossRef Google Scholar

    [124] 张广泽, 贾哲强, 冯君, 等, 2022. 铁路隧道双指标高地应力界定及岩爆大变形分级标准[J]. 铁道工程学报, 39(8): 53-58, 65.

    Google Scholar

    [125] 张鹏, 孙治国, 王秋宁, 等, 2017a. 木寨岭深埋隧道北段地应力测量与围岩稳定性分析[J]. 地质力学学报, 23(6): 893-903.

    Google Scholar

    [126] 张鹏, 曲亚明, 郭长宝, 等, 2017b. 西藏林芝地应力测量监测与尼泊尔MS8.1级强震远场响应分析[J]. 现代地质, 31(5): 900-910.

    Google Scholar

    [127] 张文新, 张建国, 唐绍武, 等, 2013. 木寨岭隧道地应力特征及对隧道变形影响的研究[J]. 隧道建设, 33(2): 116-121.

    Google Scholar

    [128] 张勇, 肖平西, 丁秀丽, 等, 2012. 高地应力条件下地下厂房洞室群围岩的变形破坏特征及对策研究[J]. 岩石力学与工程学报, 31(2): 228-244. doi: 10.3969/j.issn.1000-6915.2012.02.002

    CrossRef Google Scholar

    [129] 张玉芳, 袁坤, 周文皎, 等, 2023. 门源地震对跨冷龙岭断层的大梁隧道结构变形特征和地表裂缝分布规律研究[J]. 岩石力学与工程学报, 42(5): 1055-1069. doi: 10.13722/j.cnki.jrme.2022.0609

    CrossRef Google Scholar

    [130] 张玉玺, 2021. 色季拉山交通廊道现今地应力场特征研究[J]. 工程地质学报, 29(2): 394-403. doi: 10.13544/j.cnki.jeg.2021-0126

    CrossRef Google Scholar

    [131] 朱爽, 占伟, 梁洪宝, 等, 2022. 青海门源6.9级地震同震及震前GNSS变形特征分析[J]. 地震工程学报, 44(2): 370-379. doi: 10.20000/j.1000-0844.20220215008

    CrossRef Google Scholar

    [132] 邹旭明, 钟菊芳, 陈竹, 等. 基于数值模拟方法的溪洛渡水库蓄水后地震活动性突变原因分析[J]. 水利水电技术(中英文), 2022, 53(10): 186-197.

    Google Scholar

  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Figures(6)

Tables(1)

Article Metrics

Article views(996) PDF downloads(86) Cited by(0)

Access History

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint