2007 Vol. 27, No. 6
Article Contents

LI Guang-xue, LIU Zhen-fei, SHI Jing-hao, CHU Xin-jie, LI Jun-jie, LIU Gao-gao. THE TEST ON RELATION BETWEEN PIPELINE UNDERCUTTING AND WAVE FORCE CHANGES[J]. Marine Geology & Quaternary Geology, 2007, 27(6): 31-38.
Citation: LI Guang-xue, LIU Zhen-fei, SHI Jing-hao, CHU Xin-jie, LI Jun-jie, LIU Gao-gao. THE TEST ON RELATION BETWEEN PIPELINE UNDERCUTTING AND WAVE FORCE CHANGES[J]. Marine Geology & Quaternary Geology, 2007, 27(6): 31-38.

THE TEST ON RELATION BETWEEN PIPELINE UNDERCUTTING AND WAVE FORCE CHANGES

  • Due to the special meanings of submarine oil and gas pipelines in marine energy development,researchers have had a large number of safe experimental studies, and especially pay attention to the combined experiments made in different bottoms, different wave conditions and different burying depths. This present gutter test of wave aims at scouring and hanging-up which are dangerous to the pipeline security,in order to understand the relation between wave pressure on pipelines and the undercutting in silty seafloor represented by the Yellow River delta.The test result indicates that the pressure change is closely related with the undercutting course.Our continuous test shows that submarine pipeline is closely correlative with soil of sea bed and waves. The scouring and undercutting of pipeline under wave action experience three developing stages:silt stirring stage, current tunnel developing stage, swift undercutting and scouring equilibrium stage.Flow from the current tunnel plays an important role in scouring and undercutting.With scouring and undercutting, pipeline wave action transforms regularly from positive to negative force gradually, which can be divided into four developing stages:the initial scouring stage during which pipeline wave function is mainly positive,and pipeline shows vibrations under positive force; tunnel development stage during which pipeline vibrates up and down under the wave-crest lifting force and wave-trough downward-pulling force; pipeline hanging-up stage:pipeline vibrates forward and backward according to the negative wave crest and positive wave trough efforts; scouring equilibrium stage:pipeline vibrates mainly under negative force.
  • 加载中
  • [1] Herbich J B. Offshore pipeline design elements[M]. New York:Marcel Dekkerinc, 1981:233.

    Google Scholar

    [2] Kenneth R Demars, et al. Measurement of wave induced pressures and stresses in a sand bed[J].Marine Geotechnology,1985,6(1):20-59.

    Google Scholar

    [3] Brennodden H, Sveggen O,Wagner D A,et al. Full-scale pipe-soil inter-action tests[C]//Proceedings of the Eighteenth Annual Offshore Technology Conference,OTC 5338, 1986:433-440.

    Google Scholar

    [4] Wagner D A,Murff J D,Brennodden H, et al. Pipe-soil interaction model[C]//Proceedings of Nineteenth Annual Offshore Technology Conference.1987:181-190.

    Google Scholar

    [5] Allen D W, Lammert W F,Hale J R, et al. Submarine pipeline on-bottom stability:recent AGA research[C]//Proceedings of the Offshore Technology Conference.1989:121-132.

    Google Scholar

    [6] Brennodden H, Lieng J T,Sotberg T, et al. An energy-based pipe-soil interaction model[C]//Proceedings of 21st Annual Offshore Technology Conference.1989:147-158.

    Google Scholar

    [7] Ch Madhu Sudhan, Sundar V,Narasimha S Rao. Wave induced forces around buried pipelines[J]. Ocean Engineering,2002,29:533-544.

    Google Scholar

    [8] 闫澍旺, 王金英. 往复荷载作用下软粘土中浅埋管道的稳定性的振动台模型试验研究[J].海洋工程,1998, 16(4):39-47.

    Google Scholar

    [YAN Shu-wang, WANG Jin-ying. Research on stablity of marine pipelines buried in soft clay under cyckic loading by model testing on the Vibrating table[J]. Ocean Engineering,1998,16(4):39-47.]

    Google Scholar

    [9] 高福平, 顾小芸, 浦群. 海底管道失稳过程的模型试验研究[J].岩土工程学报, 2000, 22(3):304-308.

    Google Scholar

    [GAO Fu-ping, GU Xiao-yun, PU Qun. Study of model test on the course of submarine pipeline losing stabilization[J].Geotechnical Engineering Transaction, 2000, 22(3):304-308.]

    Google Scholar

    [10] 任艳荣, 刘玉标, 顾小芸. 多孔弹性海床上的管土相互作用数值模拟[J].中国海洋平台,2004,19(5):15-19.

    Google Scholar

    [REN Yan-rong, LIU Yu-biao, GU Xiao-yun. Numerical simulation on the reciprocity between pipeline and soil on multiorifice elastic seabed[J].Chinese Platform,2004,19(5):15-19.]

    Google Scholar

    [11] 高福平, 顾小芸, 吴应湘. 考虑波-管-土耦合作用的海底管道在位稳定性分析方法[J]. 海洋工程, 2005, 23(1):6-12.

    Google Scholar

    [GAO Fu-ping, GU Xiao-yun, WU Ying-xiang. Analysis method of stabilization of submarine pipeline calculating coupling function of wave-pipeline-soil[J].Ocean Engineering, 2005,23(1):6-12.]

    Google Scholar

    [12] 李玉成, 陈兵. 海底管线上波浪力的大涡模拟及三步有限元数值模拟[J].海洋学报,1999,21(6):87-93.

    Google Scholar

    [LI Yu-cheng, CHEN Bing. Large eddy simulation and three steps finite element numerical simulation on submarine pipeline[J].Acta Oceanologica Sinica,1999,21(6):87-93.]

    Google Scholar

    [13] 李广雪, 庄克琳, 姜玉池. 黄河三角洲沉积体的工程不稳定性[J].海洋地质与第四纪地质, 2000,20(2):21-26.

    Google Scholar

    [LI Guang-xue, ZHUANG Ke-lin, JIANG Yu-chi. Engineering instability of body of the deposit of Yellow River Delta[J]. Marine Geology and Quaternary Period Geology, 2000, 20(2):21-26.]

    Google Scholar

  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Article Metrics

Article views(874) PDF downloads(2) Cited by(0)

Access History

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint