2021 Vol. 40, No. 9
Article Contents

SUN Xiaoping, ZENG Peng, ZHANG Tianlong, WANG Sheng. Assessment of exceedance probability of landslide run-out distance and hazard zoning[J]. Geological Bulletin of China, 2021, 40(9): 1560-1569.
Citation: SUN Xiaoping, ZENG Peng, ZHANG Tianlong, WANG Sheng. Assessment of exceedance probability of landslide run-out distance and hazard zoning[J]. Geological Bulletin of China, 2021, 40(9): 1560-1569.

Assessment of exceedance probability of landslide run-out distance and hazard zoning

More Information
  • In view of the large uncertainties embedded in the physical and mechanical parameters of the dynamic numerical model, a quantitative method to assess exceedance probability of landslide run-out distance based on Latin Hypercube Sampling(LHS) is proposed to improve the reliability of landslide slide prediction results.In the proposed method, the input parameters are considered as random variables with probability distribution functions; the LHS is used to generate stratified samplings for the random variables, and the dynamic numerical model is used to compute the landslide run-out distance corresponding to each random sample; and finally, the exceedance probability of landslide run-out distance is calculated by constructing limit state functions for different run-out distance threshold values.The proposed method is applied to conduct a probabilistic assessment of the run-out distance for Dabaozi landslide, and the 95% confidence interval of the run-out distance is computed as[196 m, 302 m].According to the run-out distance-exceedance probability curve, the potential affected area of the landslide is classified into five categories(i.e., extremely high, high, medium, low and extremely low) based on different threshold values of exceedance probability(i.e., 50%, 10%, 1% and 0.1%).The calculation results show that the actual run-out distance of landslide is within the 95% confidence interval, and the actual threat range is also within the classified high-extremely high danger zone.The results show that the evaluation results are reasonable and the landslide movement risk evaluation based on the distance exceeding probability is also proved effective.The proposed method may provide new ideas for landslide run-out distance assessment and for hazard zoning, which has important theoretical significance and practical engineering value.

  • 加载中
  • [1] Dai F C, Lee C F, Ngai Y Y. Landslide risk assessment and management: an overview[J]. Engineering Geology, 2002, 64(1): 65-87. doi: 10.1016/S0013-7952(01)00093-X

    CrossRef Google Scholar

    [2] 吴越, 刘东升, 周忠浩. 考虑滑动过程内部崩解耗散的滑坡体运动模型[J]. 岩土工程学报, 2015, 37(1): 35-46.

    Google Scholar

    [3] Corominas J, van Westen C, Frattini P, et al. Recommendations for the quantitative analysis of landslide risk[J]. Bulletin of Engineering Geology and the Environment, 2014, 73(2): 209-263.

    Google Scholar

    [4] 詹威威, 黄润秋, 裴向军, 等. 沟道型滑坡-碎屑流运动距离经验预测模型研究[J]. 工程地质学报, 2017, 25(1): 154-163.

    Google Scholar

    [5] 邵葆蓉, 孙即超, 朱月琴, 等. 基于多元回归的黄土滑坡滑动距离预测模型探讨——以甘肃天水地区为例[J]. 地质通报, 2020, 39(12): 1993-2003.

    Google Scholar

    [6] Zhan W, Fan X, Huang R, et al. Empirical prediction for travel distance of channelized rock avalanches in the Wenchuan earthquake area[J]. Natural Hazards & Earth System Sciences, 2017, 17(6): 833-844.

    Google Scholar

    [7] Hungr O, McDougall S. Two numerical models for landslide dynamic analysis[J]. Computers & Geosciences, 2009, 35(5): 978-992.

    Google Scholar

    [8] Beguería S, Van Asch T W J, Malet J P, et al. A GIS-based numerical model for simulating the kinematics of mud and debris flows over complex terrain[J]. Natural Hazards and Earth System Sciences, 2009, 9(6): 1897-1909. doi: 10.5194/nhess-9-1897-2009

    CrossRef Google Scholar

    [9] Christen M, Kowalski J, Bartelt P. RAMMS: Numerical simulation of dense snow avalanches in three-dimensional terrain[J]. Cold Regions Science and Technology, 2010, 63(1/2): 1-14.

    Google Scholar

    [10] Van Westen C J, Van Asch T W J, Soeters R. Landslide hazard and risk zonation-why is it still so difficult?[J]. Bulletin of Engineering Geology and the Environment, 2006, 65(2): 167-184. doi: 10.1007/s10064-005-0023-0

    CrossRef Google Scholar

    [11] Quan L. Dynamic numerical run-out modeling for quantitative landslide risk assessment[D]. Doctoral Thesis of University of Twente, ITC, 2012, 206: 1-237.

    Google Scholar

    [12] Luna B Q, Cepeda J, Stumpf A, et al. Application of a Monte Carlo method for modeling debris flow run-out[C]//EGU General Assembly Conference. EGU General Assembly Conference Abstracts, 2012.

    Google Scholar

    [13] 祝玉学. 边坡可靠性分析[M]. 北京: 冶金工业出版, 1993.

    Google Scholar

    [14] Zahra T. Quantifying uncertainties in Landslide Runout Modelling[M]. University of Twente Faculty of Geo-Information and Earth Observation(ITC), 2010.

    Google Scholar

    [15] Zaalishvili V B, Rogozhin E A. Assessment of seismic hazard of territory on basis of modern methods of detailed zoning and seismic microzonation[J]. Open Construction and Building Technology Journal, 2011, 5: 30-40.

    Google Scholar

    [16] 唐荣昌, 张耀国, 黄祖智, 等. 四川石棉-西昌地区地震区划研究[J]. 地震研究, 1993, 16(3): 306-315.

    Google Scholar

    [17] 唐川, 周钜乾, 朱静, 等. 泥石流堆积扇危险度分区评价的数值模拟研究[J]. 灾害学, 1994, 9(4): 7-13.

    Google Scholar

    [18] Wei F, Hu K, Lopez J L, et al. Method and its application of the momentum model for debris flow risk zoning[J]. Chinese Science Bulletin, 2003, 48(6): 594. doi: 10.1360/03tb9126

    CrossRef Google Scholar

    [19] Ouyang C, He S, Xu Q, et al. A MacCormack-TVD finite difference method to simulate the mass flow in mountainous terrain with variable computational domain[J]. Computers & Geosciences, 2013, 52: 1-10.

    Google Scholar

    [20] Ouyang C, He S, Tang C. Numerical analysis of dynamics of debris flow over erodible beds in Wenchuan earthquake-induced area[J]. Engineering Geology, 2015, 194: 62-72. doi: 10.1016/j.enggeo.2014.07.012

    CrossRef Google Scholar

    [21] Ouyang C, He S, Xu Q. MacCormack-TVD finite difference solution for dam break hydraulics over erodible sediment beds[J]. Journal of Hydraulic Engineering, 2014, 141(5): 06014026.

    Google Scholar

    [22] Ouyang C, Zhao W, He S, et al. Numerical modeling and dynamic analysis of the 2017 Xinmo landslide in Maoxian County, China[J]. Journal of Mountain Science, 2017, 14(9): 1701-1711. doi: 10.1007/s11629-017-4613-7

    CrossRef Google Scholar

    [23] Xing A G, Wang G, Yin Y P, et al. Dynamic analysis and field investigation of a fluidized landslide in Guanling, Guizhou, China[J]. Engineering Geology, 2014, 181: 1-14. doi: 10.1016/j.enggeo.2014.07.022

    CrossRef Google Scholar

    [24] McKay M D, Beckman R J, Conover W J. Comparison of three methods for selecting values of input variables in the analysis of output from a computer code[J]. Technometrics, 1979, 21(2): 239-245.

    Google Scholar

    [25] Olsson A, Sandberg G, Dahlblom O. On Latin hypercube sampling for structural reliability analysis[J]. Structural Safety, 2003, 25(1): 47-68. doi: 10.1016/S0167-4730(02)00039-5

    CrossRef Google Scholar

    [26] 吴振君. 土体参数空间变异性模拟和土坡可靠度分析方法应用研究[D]. 中国科学院研究生院(武汉岩土力学研究所)博士学位论文, 2009.

    Google Scholar

    [27] 沈伟, 翟张辉, 李同录, 等. 陕西泾河南岸大堡子高速远程黄土滑坡运动过程模拟[J]. 工程地质学报, 2016, 24(6): 1309-1317.

    Google Scholar

    [28] 郭剑. 一种双层结构的高速远程滑坡运动学模型及应用[D]. 长安大学硕士学位论文, 2018.

    Google Scholar

    [29] 重庆市质量技术监督局. DB50/T 143-2018地质灾害防治工程勘查规范[S]. 2018.

    Google Scholar

    [30] 袁晓蕾. 黄土滑坡的滑带土强度试验参数统计及可靠性研究[D]. 长安大学硕士学位论文, 2007.

    Google Scholar

    [31] 倪万魁, 韩启龙. 黄土土性参数的统计分析[J]. 工程地质学报, 2001, 9(1): 62-67. doi: 10.3969/j.issn.1004-9665.2001.01.011

    CrossRef Google Scholar

    [32] Gao Y, Yin Y, Li B, et al. Investigation and dynamicanalysis of the long runout catastrophic landslide at the Shenzhen landfill on December 20, 2015, in Guangdong, China[J]. Environmental Earth Sciences, 2017, 76(1): 13. doi: 10.1007/s12665-016-6332-8

    CrossRef Google Scholar

    [33] Lacasse S, Nadim F. Learning to live with geohazards: from research to practice[M]. Geo-Risk 2011: Risk Assessment and Management, 2011: 64-116.

    Google Scholar

  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Figures(10)

Tables(3)

Article Metrics

Article views(1923) PDF downloads(15) Cited by(0)

Access History

Other Articles By Authors

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint