TANG Shi-bo, XIONG Wei, PENG Wan-li, ZHOU Hong-jun, DONG Jin-song. Measures and Suggestions for Strengthening the Management of Drilling Project[J]. DRILLING ENGINEERING, 2015, (8): 68-70,79. doi: 10.3969/j.issn.1672-7428.2015.08.015
Citation: |
TANG Shi-bo, XIONG Wei, PENG Wan-li, ZHOU Hong-jun, DONG Jin-song. Measures and Suggestions for Strengthening the Management of Drilling Project[J]. DRILLING ENGINEERING, 2015, (8): 68-70,79. doi: 10.3969/j.issn.1672-7428.2015.08.015
|
Measures and Suggestions for Strengthening the Management of Drilling Project
-
Abstract
Some measures and suggestions are put forward to strengthen drilling project management work in quality, effi-ciency and technology management; environment protection and qualification management in order to improve the quality and efficiency of geological core drilling, realize economic benefit maximization and improve the accuracy of prospecting re-sults.
-
-
-
Access History