ZHANG Yong-quan, LI Chao-hua. Construction Technology of Hole Deviation Control for Horizontal Pre-stressed Anchor in the Underground Powerhouse System of Jinping First Stage Hydropower Station[J]. DRILLING ENGINEERING, 2010, (11): 64-66. doi: 10.3969/j.issn.1672-7428.2010.11.019
Citation: ZHANG Yong-quan, LI Chao-hua. Construction Technology of Hole Deviation Control for Horizontal Pre-stressed Anchor in the Underground Powerhouse System of Jinping First Stage Hydropower Station[J]. DRILLING ENGINEERING, 2010, (11): 64-66. doi: 10.3969/j.issn.1672-7428.2010.11.019

Construction Technology of Hole Deviation Control for Horizontal Pre-stressed Anchor in the Underground Powerhouse System of Jinping First Stage Hydropower Station

通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Article Metrics

Article views(136) PDF downloads(5) Cited by(0)

Access History

Other Articles By Authors

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint