ZHANG Yong-quan, LI Chao-hua. Construction Technology of Hole Deviation Control for Horizontal Pre-stressed Anchor in the Underground Powerhouse System of Jinping First Stage Hydropower Station[J]. DRILLING ENGINEERING, 2010, (11): 64-66. doi: 10.3969/j.issn.1672-7428.2010.11.019
Citation: |
ZHANG Yong-quan, LI Chao-hua. Construction Technology of Hole Deviation Control for Horizontal Pre-stressed Anchor in the Underground Powerhouse System of Jinping First Stage Hydropower Station[J]. DRILLING ENGINEERING, 2010, (11): 64-66. doi: 10.3969/j.issn.1672-7428.2010.11.019
|
Construction Technology of Hole Deviation Control for Horizontal Pre-stressed Anchor in the Underground Powerhouse System of Jinping First Stage Hydropower Station