Treatment Technology of Accident in a Borehole of Main Pier of Jintang Bridge[J]. DRILLING ENGINEERING, 2010, (9): 61-63. doi: 10.3969/j.issn.1672-7428.2010.09.015
Citation:
Treatment Technology of Accident in a Borehole of Main Pier of Jintang Bridge[J]. DRILLING ENGINEERING, 2010, (9): 61-63. doi: 10.3969/j.issn.1672-7428.2010.09.015
Treatment Technology of Accident in a Borehole of Main Pier of Jintang Bridge
Treatment Technology of Accident in a Borehole of Main Pier of Jintang Bridge[J]. DRILLING ENGINEERING, 2010, (9): 61-63. doi: 10.3969/j.issn.1672-7428.2010.09.015
Treatment Technology of Accident in a Borehole of Main Pier of Jintang Bridge[J]. DRILLING ENGINEERING, 2010, (9): 61-63. doi: 10.3969/j.issn.1672-7428.2010.09.015