LI Shi-jing, CHEN Hong-ru. Construction Technique of Large Diameter Under-reamed Bored Cast-in-place Pile in Macao Meigaomei Golden Palace[J]. DRILLING ENGINEERING, 2006, (12): 5-8. doi: 10.3969/j.issn.1672-7428.2006.12.002
Citation:
LI Shi-jing, CHEN Hong-ru. Construction Technique of Large Diameter Under-reamed Bored Cast-in-place Pile in Macao Meigaomei Golden Palace[J]. DRILLING ENGINEERING, 2006, (12): 5-8. doi: 10.3969/j.issn.1672-7428.2006.12.002
Construction Technique of Large Diameter Under-reamed Bored Cast-in-place Pile in Macao Meigaomei Golden Palace
LI Shi-jing, CHEN Hong-ru. Construction Technique of Large Diameter Under-reamed Bored Cast-in-place Pile in Macao Meigaomei Golden Palace[J]. DRILLING ENGINEERING, 2006, (12): 5-8. doi: 10.3969/j.issn.1672-7428.2006.12.002
LI Shi-jing, CHEN Hong-ru. Construction Technique of Large Diameter Under-reamed Bored Cast-in-place Pile in Macao Meigaomei Golden Palace[J]. DRILLING ENGINEERING, 2006, (12): 5-8. doi: 10.3969/j.issn.1672-7428.2006.12.002