YIN Dong, WANG Shangjie. 2024. The excavation deformation mechanism and the seismic reinforcement effect evaluation of complex accumulation slope of a converter station in Southern Sichuan. Geological Survey of China, 11(4): 101-113. doi: 10.19388/j.zgdzdc.2023.319
Citation: YIN Dong, WANG Shangjie. 2024. The excavation deformation mechanism and the seismic reinforcement effect evaluation of complex accumulation slope of a converter station in Southern Sichuan. Geological Survey of China, 11(4): 101-113. doi: 10.19388/j.zgdzdc.2023.319

The excavation deformation mechanism and the seismic reinforcement effect evaluation of complex accumulation slope of a converter station in Southern Sichuan

  • The excavation deformation mechanism of the widely distributed complex accumulation slopes in the southwestern mountainous areas has a significant restriction effect on the construction of converter stations. To address the urgent needs of the converter station construction in Baihetan-Jiangsu UHV transmission project, the authors in this paper took the accumulation slope in the proposed station site as the research object, and adopted the deep displacement monitoring, in-situ test and FLAC3D numerical simulation methods to evaluale the excavation deformation mechanism of this accumulation slope and the seismic reinforcement effect under different design schemes and different pile parameters. Then the seismic reinforcement mechanism is analyzed. The results are as follows. ① The excavation of the complex accumulative slope of “multi-genetic type soil” in the converter station is prone to deformation, and the instability mode is “traction creep and tension failure mode”. ② The high and steep free face formed in the excavation process is the main factor leading to the accumulation slope deformation, and the high-water sensitivity of the accumulation slope soil is the internal inducement of the slope deformation aggravation after short duration heavy rainfall. ③ Under the two slope reinforcement schemes of circular anti-slide pile and rectangular anti-slide pile, the deformation amount of the slope body is significantly reduced, and the maximum deformation position in the slope body is located in the middle and back of the slope body. The stability coefficient of the accumulation body slope under natural and seismic conditions meets the design requirements. The use of rectangular anti-slide pile in the treatment of the accumulation body slope has higher anti-slide retaining and economic benefits. ④ The top deformation of the anti-slide pile is the largest under seismic condition, and the shear force and bending moment increase first and then decrease with the increase of seismic wave, and finally reach the maximum change trend. The maximum bending moment value is about 1/2 of the anti-slide pile body. The retaining design of slope should be combined with the distribution law of pile shear force and bending moment. The research results of this paper could provide some references for the design and construction of similar projects.
  • 加载中
  • [1] 廖红建,韩波,殷建华,等.人工开挖边坡的长期稳定性分析与土的强度参数确定[J].岩土工程学报,2002,24(5):560-564.

    Google Scholar

    Liao H J,Han B,Yin J H,et al.The long term stability of cut slope and determination of effective strength index of soils[J].Chinese Journal of Geotechnical Engineering,2002,24(5):560-564.

    Google Scholar

    [2] 胡明鉴,汪稔,张平仓.蒋家沟流域松散砾石土斜坡滑坡频发原因与试验模拟[J].岩石力学与工程学报,2002,21(12):1831-1834.

    Google Scholar

    Hu M J,Wang R,Zhang P C.Cause of frequent occurrence of gravel slope landslide and experiment simulation[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(12):1831-1834.

    Google Scholar

    [3] Kwon S,Wilson J W.Deformation mechanism of the underground excavations at the WIPP site[J].Rock Mechanics and Rock Engineering,1999,32(2):101-122.

    Google Scholar

    [4] Suh M,Koo M H,Choi S W,et al.Instability of an underground ancient tomb due to excavation and its relationship to the temperature and ground water[J].Geotechnical and Geological Engineering,2004,22(2):269-283.

    Google Scholar

    [5] 房浩,李媛,杨旭东,等.2010-2015年全国地质灾害发育分布特征分析[J].中国地质灾害与防治学报,2018,29(5):1-6.

    Google Scholar

    Fang H,Li Y,Yang X D,et al.Distribution characters of geo-hazards in China during the period of 2010-2015[J].The Chinese Journal of Geological Hazard and Control,2018,29(5):1-6.

    Google Scholar

    [6] Malan D F.Manuel Rocha medal recipient simulating the time-dependent behaviour of excavations in hard rock[J].Rock Mechanics and Rock Engineering,2002,35(4):225-254.

    Google Scholar

    [7] 冯君,周德培,李安洪.顺层岩质边坡开挖稳定性研究[J].岩石力学与工程学报,2005,24(9):1474-1478.

    Google Scholar

    Feng J,Zhou D P,Li A H.Research on stability of rock bedded slopes[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(9):1474-1478.

    Google Scholar

    [8] 文奎,王根,晏长根.地下水与边坡开挖对滑坡稳定性影响的分析[J].铁道建筑,2014(2):80-82,118.

    Google Scholar

    Wen K,Wang G,Yan C G.Analysis of influence of groundwater and slope excavation on landslide stability[J].Railway Engineering,2014(2):80-82,118.

    Google Scholar

    [9] 侯晓坤,李同录,李萍.开挖黄土高边坡的应力路径及变形破坏机制分析[J].岩土力学,2014,35(S2):548-555.

    Google Scholar

    Hou X K,Li T L,Li P.Analysis of stress path and deformation-failure mechanism of high cutting loess slope[J].Rock and Soil Mechanics,2014,35(S2):548-555.

    Google Scholar

    [10] 钟雨奕,苏海,潘皇宋.成仁高速红层分布区开挖边坡变形特征及机制[J].煤田地质与勘探,2017,45(2):96-100.

    Google Scholar

    Zhong Y Y,Su H,Pan H S.Deformation characteristics and mechanism of an excavation slope in red bed area of Chengren high-way[J].Coal Geology & Exploration,2017,45(2):96-100.

    Google Scholar

    [11] 王维早,许强,郑光,等.强降雨诱发缓倾堆积层边坡失稳离心模型试验研究[J].岩土力学,2016,37(1):87-95.

    Google Scholar

    Wang W Z,Xu Q,Zheng G,et al.Centrifugal model tests on sliding failure of gentle debris slope under rainfall[J].Rock and Soil Mechanics,2016,37(1):87-95.

    Google Scholar

    [12] 吴庆华,王珂.细/粗二元结构边坡角度与岩性特征对其阻隔降雨入渗的影响规律研究[J/OL].地球科学:1-10.(2023-09-12).https://www.doc88.com/p-97647644202007.html.

    Google Scholar

    Wu Q H,Wang K.Effect of angle and lithology on infiltrating to fine/coarse dual-structure slope under rainfall condi-tion[J/OL].Earth Sciences:1-10.(2023-09-12).https://www.doc88.com/p-97647644202007.html.

    Google Scholar

    [13] 程强,黄绍槟,周永江.公路深挖路堑边坡工程施工监测与动态设计[J].岩石力学与工程学报,2005,24(8):1335-1340.

    Google Scholar

    Cheng Q,Huang S B,Zhou Y J.Construction monitor and dynamic design of highway deep road cut slope[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(8):1335-1340.

    Google Scholar

    [14] 董治军,徐聪,施季红.某换流站边坡变形机理及应急治理设计[J].土工基础,2015,29(1):8-12.

    Google Scholar

    Dong Z J,Xu C,Shi J H.Mitigation of the excessive deformation of a slope for the electricity transformation station[J].Soil Engineering and Foundation,2015,29(1):8-12.

    Google Scholar

    [15] 徐聪,胡新丽,沙玉,等.填方边坡变形机制研究[J].安全与环境工程,2015,22(1):39-44.

    Google Scholar

    Xu C,Hu X L,Sha Y,et al.Study on deformation mechanism of a fill slope[J].Safety and Environmental Engineering,2015,22(1):39-44.

    Google Scholar

    [16] 杨明钰,陈红旗,祁小博,等.基于可靠度理论的地震滑坡运动距离预测模型[J].中国地质调查,2023,10(3):102-109.

    Google Scholar

    Yang M Y,Chen H Q,Qi X B,et al.Prediction model for the landslide movement distance induced by earthquake based on the reliability theory[J].Geological Survey of China,2023,10(3):102-109.

    Google Scholar

    [17] 张辉,莫思,谭海英.基于综合监测的滑坡应急治理效果评价——以贵州省桐梓县天池宫滑坡为例[J].中国地质调查,2023,10(2):87-93.

    Google Scholar

    Zhang H,Mo S,Tan H Y.Effect evaluation of landslide emergency treatment based on automatic monitoring:A case study of Tianchigong landslide in Tongzi county of Guizhou Province[J].Geological Survey of China,2023,10(2):87-93.

    Google Scholar

    [18] 刘腾,任蕊,匡野,等.四川省北川县崩滑灾害孕灾地质条件分析[J].中国地质调查,2022,9(6):59-66.

    Google Scholar

    Liu T,Ren R,Kuang Y,et al.Analysis on the disaster-pregnancy geological conditions of collapse and landslide in Beichuan County,Sichuan Province[J].Geological Survey of China,2022,9(6):59-66.

    Google Scholar

    [19] 涂义亮,陈晓虎,王星驰,等.基于连续-离散耦合强度折减法的边坡稳定性分析[J/OL].工程力学:1-12.http://engineeringmechanics.cn/cn/article/doi/10.6052/j.issn.1000-4750.2022.12.1047.

    Google Scholar

    Tu Y L,Chen X H,Wang X C,et al.Slope stability analysis by strength reduction method upon continuous-discrete coupling method[J/OL].Engineering Mechanics:1-12.http://engineeringmechanics.cn/cn/article/doi/10.6052/j.issn.1000-4750.2022.12.1047.

    Google Scholar

    [20] 魏云杰,王俊豪,胡爱国,等.澜沧江拉金神谷滑坡成灾机理分析[J].中国地质调查,2022,9(4):19-26.

    Google Scholar

    Wei Y J,Wang J H,Hu A G,et al.Analysis of formation mechanism of Lajinshengu landslide in Lancang River[J].Geological Survey of China,2022,9(4):19-26.

    Google Scholar

    [21] 田凯,姚品品,铁永波,等.地下水渗流场对库区滑坡稳定性影响的数值模拟——以白马库区羊角滩滑坡为例[J].中国地质调查,2022,9(4):74-81.

    Google Scholar

    Tian K,Yao P P,Tie Y B,et al.Numerical simulation study of the influence of groundwater seepage field on the stability of landslide in reservoir:A case study in Yangjiaotan landslide of Baimaku area[J].Geological Survey of China,2022,9(4):74-81.

    Google Scholar

    [22] 胡庆安,夏永旭,赵子胜.抗滑桩滑坡治理工程数值模拟研究[J].长安大学学报:建筑与环境科学版,2003,20(4):8-12.

    Google Scholar

    Hu Q A,Xia Y X,Zhao Z S.Finite element numerical simulation of slipping slope treatment by anti-slipping piles[J].Journal of Chang'an University:Architecture and Environmental Science Edition,2003,20(4):8-12.

    Google Scholar

    [23] 朱安龙,张胤,戴妙林,等.基于FLAC3D数值模拟的让压锚索边坡加固机理研究[J].岩土工程学报,2017,39(4):713-719.

    Google Scholar

    Zhu A L,Zhang Y,Dai M L,et al.Reinforcement mechanism of slopes with yielding anchor cables based on numerical simulation of FLAC3D[J].Chinese Journal of Geotechnical Engineering,2017,39(4):713-719.

    Google Scholar

    [24] 唐晓松,刘明维,叶海林.基于ABAQUS的抗滑桩三维有限元分析[J].地下空间与工程学报,2010,6(S2):1614-1618.

    Google Scholar

    Tang X S,Liu M W,Ye H L.3-dimension FEM analysis on anti-slide piles based on ABAQUS[J].Chinese Journal of Underground Space and Engineering,2010,6(S2):1614-1618.

    Google Scholar

    [25] 戴自航,徐祥.边坡抗滑桩设计计算的三维有限元法[J].岩石力学与工程学报,2012,31(12):2572-2578.

    Google Scholar

    Dai Z H,Xu X.3D finite element method for design computations of anti-slide piles[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(12):2572-2578.

    Google Scholar

    [26] 肖洪伟,黄兴,肖兵.输电线路含碎石粘性土边坡滑坡特性及预防措施[J].电力建设,2007,28(10):64-66,70.

    Google Scholar

    Xiao H W,Huang X,Xiao B.Land slide characteristics of gravel containing cohesive soil side slopes and its preventive measures[J].Electric Power Construction,2007,28(10):64-66,70.

    Google Scholar

    [27] 唐勇,余鑫,孙智慧.基于FLAC3D的抗滑桩抗震加固机理及模式研究[J].水力发电,2019,45(7):33-37.

    Google Scholar

    Tang Y,Yu X,Sun Z H.Study on seismic reinforcement mechanism and model of anti-slide piles based on FLAC3D[J].Water Power,2019,45(7):33-37.

    Google Scholar

    [28] 陈富坚,黄世斌,包惠明.抗滑桩加固工程的体系可靠度及其计算模型[J].工程抗震与加固改造,2009,31(6):15-18.

    Google Scholar

    Chen F J,Huang S B,Bao H M.The system reliability of anti-slide pile and their calculating models[J].Earthquake Resistant Engineering and Retrofitting,2009,31(6):15-18.

    Google Scholar

    [29] 冼进业,陈建林,李长冬,等.复合多层顺倾岩质边坡最优锚固角研究[J].人民长江,2023,54(10):221-227,242.

    Google Scholar

    Xian J Y,Chen J L,Li C D,et al.Optimal anchor angle of anchor in composite multi-layer bedding rock slope using unified strength theory[J].Yangtze River,2023,54(10):221-227,242.

    Google Scholar

    [30] 王存智,张炜,李晨冬,等.基于GIS和层次分析法的沙溪流域滑坡地质灾害易发性评价[J].中国地质调查,2022,9(5):51-60.

    Google Scholar

    Wang C Z,Zhang W,Li C D,et al.Susceptibility evaluation of landslide hazards of Shaxi river basin based on GIS and AHP[J].Geological Survey of China,2019,9(5):51-60.

    Google Scholar

    [31] 黄艳琴,李为乐,许洲,等.国道213汶川-松潘段滑坡隐患遥感识别与易发性评价[J].中国地质调查,2022,9(4):121-133.

    Google Scholar

    Huang Y Q,Li W L,Xu Z,et al.Remote sensing identification and susceptibility evaluation of landslide hazards in Wenchuan-Songpan section of National Highway 213[J].Geological Survey of China,2022,9(4):121-133.

    Google Scholar

    [32] 周毅,丁明涛,黄涛,等.芦山县滑坡灾害影响因素的空间分异性[J].中国地质调查,2022,9(4):45-55.

    Google Scholar

    Zhou Y,Ding M T,Huang T,et al.Spatial heterogeneity of influencing factors of landslide disasters in Lushan county[J].Geological Survey of China,2022,9(4):45-55.

    Google Scholar

    [33] 杨峰,薛桂澄,柳长柱,等.海南省澄迈县福山镇高铁站前道路土体滑坡的GEO5数值模拟研究[J].中国地质调查,2020,7(4):104-111.

    Google Scholar

    Yang F,Xue G C,Liu C Z,et al.GEO5 numerical simulation research on the soil landslide in the front road of Fushan high-speed railway station in Chengmai county of Hainan province[J].Geological Survey of China,2020,7(4):104-111.

    Google Scholar

  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Article Metrics

Article views(74) PDF downloads(1) Cited by(0)

Access History

Other Articles By Authors

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint