Geological Publishing House, Institute of Exploration Technology, Chinese Academy of Geological SciencesHost
2024 Vol. 51, No. 1
Article Contents

YANG Dong, ZHOU Tianyou, CAI Qiang, JIANG Zhaoqun, LI Zhong and CHEN Wenjun, . 2024. Research and application on prestress detection equipment for in-service anchors. DRILLING ENGINEERING, 51(1): 106-112. doi: 10.12143/j.ztgc.2024.01.014
Citation: YANG Dong, ZHOU Tianyou, CAI Qiang, JIANG Zhaoqun, LI Zhong and CHEN Wenjun, . 2024. Research and application on prestress detection equipment for in-service anchors. DRILLING ENGINEERING, 51(1): 106-112. doi: 10.12143/j.ztgc.2024.01.014

Research and application on prestress detection equipment for in-service anchors

  • The existing anchor cable prestress detection equipments can only be used when the length of the exposed section of the anchor is above 70cm and the anchor cable is not in operation and maintenance period. Most of these devices weigh more than 150 kg, which is too heavy for detectiing the anchor in high and steep slopes. In order to overcome the above problems, a new anchor cable prestress detection equipment HRAD-300 was developed. It can be applied to the prestress detection of in-service anchor with exposed length of 7cm. The measurement error is less than 0.01mm when the displacement range of the detector is 200mm, while the measurement error is ±1%FS when the force range is 300kN. The weight of a single box of the equipment is less than 15kg, and the total weight is less than 40kg. Based on the principle of reverse pull method and the shape of detection curve, the effective anchored prestress algorithm was proposed, and the software is programmed. The indoor test shows that there are no obvious mutation points in the detection curve. The calculated values were basically consistent with the original locked values. The equipment was used to detect the anchor of the unstable slope of Fenghuang rock. The field anchor detection curves has obvious mutation points and steep drops. The anchor cable runs well and keeps on working. The prestress loss of the No.2 anchor cable is more obvious, and the way of compensate and stretch can be taken. Uneven stress exists in the same anchor cable. In conclusion, the HRAD-300 is intelligent and light, which can provide data for the health evaluation of anchorage engineering.
  • 加载中
  • [1] Li Shucai, Wang Hongtao, Wang Qi. Failure mechanism of bolting support and high-strength bolt-grouting technology for deep and soft surrounding rock with high stress[J]. Journal of Central South University, 2016(23):440-448.

    Google Scholar

    [2] [2] 江权,陈建林,冯夏庭.大型地下洞室对穿预应力锚索失效形式与耦合模型[J].岩土力学,2013,34(8):2271-2279.

    Google Scholar

    JIANG Quan, CHEN Jianlin, FENG Xiating. The failure form and coupling model of prestressed anchorage cable for large underground caverns and coupling model[J]. Rock and Soil Mechanics, 2013,34(8):2271-2279.

    Google Scholar

    [3] [3] 王全成,姜昭群,罗宏保,等.自承载式预应力锚索现场试验研究[J].探矿工程(岩土钻掘工程),2018,45(8):79-82,87.

    Google Scholar

    WANG Quancheng, JIANG Zhaoqun, LUO Hongbao, et al. Field test of self-bearing pre-stressed anchor cable[J]. Exploration Engineering (Rock & Soil Drilling and Tunnling), 2018,45(8):79-82,87.

    Google Scholar

    [4] [4] 罗宏保,王全成,张勇,等.预应力锚索孔内扩孔工艺的研究[J].探矿工程(岩土钻掘工程),2016,43(10):44-48.

    Google Scholar

    LUO Hongbao, WANG Quancheng, ZHANG Yong, et al. Research on pre-stressed anchor cable hole reaming technology[J]. Exploration Engineering (Rock & Soil Drilling and Tunnling), 2016,43(10):44-48.

    Google Scholar

    [5] [5] 郝峰,李存峰.跨断层牛顿力监测系统超大长度锚索综合施工技术[J].钻探工程,2021,48(5):88-95.

    Google Scholar

    HAO Feng, LI Cunfeng. Comprehensive construction technology for super-long anchor cables for the cross-fault Newton force monitoring system[J]. Drilling Engineering, 2021,48(5):88-95.

    Google Scholar

    [6] [6] 董志宏,丁秀丽,黄书岭,等.高地应力区大型洞室锚索时效受力特征及长期承载风险分析[J].岩土力学,2019,40(1):352-361.

    Google Scholar

    DONG Zhihong, DING Xiuli, HUANG Shuling, et al. Analysis of ageing-stress characteristics and long-term bearing risk of anchor cable for a large cavern in high geo-stress area[J]. Rock and Soil Mechanics, 2019,40(1):352-361.

    Google Scholar

    [7] [7] 陶志刚,任树林,郝宇,等.层状反倾边坡破坏机制及NPR锚索控制效果物理模型试验[J].岩土力学,2021,42(4):977-990.

    Google Scholar

    TAO Zhigang, REN Shulin, HAO Yu, et al. Physical model experiment on failure mechanism and NPR anchor cable control effect of layered counter-tilt slope[J]. Rock and Soil Mechanics,2021,42(4):977-990.

    Google Scholar

    [8] [8] 程良奎,韩军,张培文.岩土锚固工程的长期性能与安全评价[J].岩石力学与工程学报,2008,27(5):865-872.

    Google Scholar

    CHENG Liangkui, HAN Jun, ZHANG Peiwen. Long term performance and safety evaluation of geotechnical anchorage engineering[J]. Chinese Journal of Rock Mechanics and Engineering, 2008,27(5):865-872.

    Google Scholar

    [9] [9] Kwun H, Bartels K A. Magnetostrictive sensor technology and its applications[J]. Ultrasonics, 1998,36(1-5):171-178.

    Google Scholar

    [10] [10] Klar Assaf, Nissim Ori, Elkayam Itai. A hardeningload transfer function for rock bolts and its calibration using distributed fiber optic sensing[J]. Journal of Rock Mechanics and Geotechnical Engineering, https://doi.org/10.1016/j.jrmge. 2022.12.027.

    Google Scholar

    [11] [11] 张维平.一种基于谱能比的数字信号分析方法:ZL201210056010.8[P].2014-05-14.

    Google Scholar

    ZHANG Weiping. A digital signal analysis method based on spectral energy ratio: ZL201210056010.8[P]. 2014-05-14.

    Google Scholar

    [12] [12] 郭琦.复杂预应力体系梁式结构有效预应力预测理论与方法研究[D].西安:长安大学,2008.GUO Qi. Study on the theory and method of effective prestress prediction for beam-type structures with complex prestressed systems[D]. Xi’an: Chang’an University, 2008.

    Google Scholar

    [13] [13] Wu Jiaye, Wu Jiaer, Yang Chao, et al. System equivalentmass based post-tensioned anchor tension testing technique[C]//ASCEGeoCongress 2012, Oakland, California: 2688-2696.

    Google Scholar

    [14] [14] 吴佳晔.等效质量法在锚下有效预应力检测中的应用[J].铁道建筑,2017(5):1-4.

    Google Scholar

    WU Jiaye. Application of equivalent mass method in inspection of effective prestress under anchorage[J]. Railway Engineering, 2017(5):1-4.

    Google Scholar

    [15] [15] 陈强,周志鸿,朱宝龙.基于外锚头段切向刚度的在役锚索预应力测试方法研究[J].岩石力学与工程学报,2022,41(8):1596-1608.

    Google Scholar

    CHEN Qiang, ZHOU Zhihong, ZHU Baolong. Study on prestress test on in-service anchor cables based on tangential stiffness of external anchor head segment[J]. Chinese Journal of Rock Mechanics and Engineering, 2022,41(8):1596-1608.

    Google Scholar

    [16] [16] Bruce Mary Ellen C, Jesus Gomez, Traylor Robert P. Repeated Lift-off Testing of Single Bore Multiple Anchors for Dam Retaining Wall over a 5-year Period[M]. New York: American Society of Civil Engineers, 2009.

    Google Scholar

    [17] [17] Miyatake Hiroaki, Oshita Takeshi, Kubo Hiroaki, et al. A new manual for ground anchor inspection, integrity investigation and remedial measures[C]// International Conference on Ground Anchorages and Anchored Structures in Service. London, 2007.

    Google Scholar

    [18] [18] Hong Kong Geotechnical Control Office. Model Specification for Prestressed Ground Anchors[M]. Hong Kong: Government Publications Centre, 1989.

    Google Scholar

    [19] [19] 付丹,郭红仙,程晓辉.预应力锚索工作应力的检测方法-拉脱法的检测机制和试验研究[J].岩土力学,2012,33(8):2247-2252.

    Google Scholar

    FU Dan, GUO Hongxian, CHENG Xiaohui. Working stress measurement of prestressed anchor cables: Detection mechanism and experimental study of lift-off test[J]. Rock and Soil Mechanics, 2012,33(8):2247-2252.

    Google Scholar

  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Article Metrics

Article views(534) PDF downloads(89) Cited by(0)

Access History

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint