Geological Publishing House, Institute of Exploration Technology, Chinese Academy of Geological SciencesHost
2024 Vol. 51, No. 1
Article Contents

SU Peng, FENG Zibo, LIU Yongsheng, HOU Ziyang and LI Weiliang, . 2024. Research on the passability of pumping bridge plug tool string for horizontal wells. DRILLING ENGINEERING, 51(1): 23-30. doi: 10.12143/j.ztgc.2024.01.004
Citation: SU Peng, FENG Zibo, LIU Yongsheng, HOU Ziyang and LI Weiliang, . 2024. Research on the passability of pumping bridge plug tool string for horizontal wells. DRILLING ENGINEERING, 51(1): 23-30. doi: 10.12143/j.ztgc.2024.01.004

Research on the passability of pumping bridge plug tool string for horizontal wells

  • The combined operation technology of horizontal well pumping bridge plug perforation has been widely used in the development of unconventional oil and gas reservoirs such as shale gas, shale oil and tight oil. In this process, the toolstring with drillable bridge plug and multistage perforating gun is sent to the designated position by hydraulic pumping. Due to the complexity of wellbore trajectory and wellbore environment, the pumping blocked and stuck occasionally occurs. According to the structural characteristics of the pumping bridge plug tool string for horizontal wells, this paper simplifies the tool string, the rigid geometric relationship between the tool string and the wellbore in the curved well section under a certain dogleg degree is analyzed, the method for determining the contact point between the pumping bridge plug tool string and the pipe wall is proposed, the stress bending characteristics in curved well sections are analysed, and the criteria for passability is established. According to the actual cases, the influencing factors including the well trajectory, the largest dogleg degree and the inner diameter of the pipe wall are analyzed, and the optimized scheme of pumping process parameters is given to reduce the occurrence of downhole accidents.
  • 加载中
  • [1] 孙海成,汤达祯,蒋廷学,等.页岩气储层压裂改造技术[J].油气地质与采收率,2011,18(4):90-93.

    Google Scholar

    SUN Haicheng, TANG Dazhen, JIANG Tingxue, et al. Fracturing and stimulation techniques of shale gas reservoir[J]. Petroleum Geology and Recovery Efficiency, 2011,18(4):90-93.

    Google Scholar

    [2] [2] 侯景龙,王传庆,李玉东,等.连续管密切割压裂工艺技术及其应用[J].钻探工程,2021,48(11):43-49.

    Google Scholar

    HOU Jinglong, WANG Chuanqing, LI Yudong, et al. Intensive cut coiled tubing fracturing technology and its application[J]. Drilling Engineering, 2021,48(11):43-49.

    Google Scholar

    [3] [3] 徐浩,袁菁华,胡康存.页岩储层层间暂堵转向工艺技术研究[J].钻探工程,2023,50(4):127-134.

    Google Scholar

    XU Hao, YUAN Jinghua, HU Kangcun. Research on inter-layer temporary plugging steering process technology for shale reservoirs[J]. Drilling Engineering, 2023,50(4):127-134.

    Google Scholar

    [4] [4] 胡光.层理性页岩力学参数对水力压裂裂缝形态的影响分析[J].钻探工程,2022,49(2):97-103.

    Google Scholar

    HU Guang. Influences of anisotropic mechanical properties in the hydraulic fracturing design in shale reservoirs[J]. Drilling Engineering, 2022,49(2):97-103.

    Google Scholar

    [5] [5] 马新华,贾爱林,谭健,等.中国致密砂岩气开发工程技术与实践[J].石油勘探与开发,2012,39(5):572-579.

    Google Scholar

    MA Xinhua, JIA Ailin, TAN Jian, et al. Tight sand gas development technologies and practices in China[J]. Petroleum Exploration and Development, 2012,39(5):572-579.

    Google Scholar

    [6] [6] 曾雨辰,杨保军,王凌冰.涪页HF-1井泵送易钻桥塞分段大型压裂技术[J].石油钻采工艺,2012,34(5):75-79.

    Google Scholar

    ZENG Yuchen, YANG Baojun, WANG Lingbing, et al. Large-scale staged fracturing technology with pump-down drillable bridge plug for Well Fuye HF-1[J]. Oil Drilling & Production Technology, 2012,34(5):75-79.

    Google Scholar

    [7] [7] 朱秀星,薛世峰,仝兴华.水平井射孔与桥塞联作管串泵送参数控制方法[J].石油勘探与开发,2013,40(3):371-376.

    Google Scholar

    ZHU Xiuxing , XUE Shifeng, TONG Xinghua. Parameter control methods for the pumping toolstring composed of perforating gun and fracturing plug in a horizontal well[J]. Petroleum Exploration and Development, 2013,40(3):371-376.

    Google Scholar

    [8] [8] 仲福惟,徐德奎,赵骊川,等.井下工具管柱水平井通过能力仿真模拟研究[J].采油工程,2014,4(1):1-5.

    Google Scholar

    ZHONG Fuwei, XU Dekui, ZHAO Lichuan, et al. Theoretical and experimental research on buckling behavior of downhole tubulars[J]. Oil Production Engineering, 2014,4(1):1-5.

    Google Scholar

    [9] [9] 邹刚,李一村,潘南林,等.基于复合材料桥塞的水平井套管分段压裂技术[J].石油机械,2013,41(3):44-47.

    Google Scholar

    ZOU Gang, LI Yicun, PAN Nanlin, et al. Research on the staged fracturing of cased-completion horizontal hole with composite material bridge plug[J]. China Petroleum Machinery, 2013,41(3):44-47.

    Google Scholar

    [10] [10] 廖玉华,杨斌,李敏.封隔器管柱效应力学模型分析[J].机械,2012,39(S1):40-43.

    Google Scholar

    LIAO Yuhua, YANG Bin, LI Min. Mechanic model analyses on packer pipe column effect[J]. Machinery, 2012,39(S1):40-43.

    Google Scholar

    [11] [11] 眭满仓,孟坤六,张琦.水平井管柱空间受力分析及迭代计算[J].石油机械,1999(9):4-7.

    Google Scholar

    SUI Mancang, MENG Kunliu, ZHANG Qi. Calculation and analysis of spatial forces on pipe string in horizontal holes[J]. China Petroleum Machinery, 1999(9):4-7.

    Google Scholar

    [12] [12] 贺志刚,付建红,施太和,等.大位移井摩阻扭矩力学模型[J].天然气工业,2001(5):52-54.

    Google Scholar

    HE Zhigang, FU Jianhong, SHI Taihe, et al. Mechanical model of frictional torque in high displacement wells[J]. Natural Gas Industry, 2001(5):52-54.

    Google Scholar

    [13] [13] 冷继先.井下管柱屈曲行为的理论与实验研究[D].成都:西南石油学院,2003.LENG Jixian. Theoretical and experimental research on buckling behavior of downhole tubulars[D]. Chengdu: Southwest Petroleum Institute, 2003.

    Google Scholar

    [14] [14] 张鸣远,等.高等工程流体力学[M].西安:西安交通大学出版社,2006:432.ZHANG Mingyuan, et al. Fluid Mechanics for Advanced Engineering[M]. Xi’an: Xi’an Jiaotong University Press, 2006:432.

    Google Scholar

    [15] [15] 张应安.水平井多封隔器压裂管柱通过性力学关键问题研究[D].大庆:东北石油大学,2011.ZHANG Ying’an. Research on key problems of mechanics formulti-packers fracturing strings pass ability in horizontal well[D]. Daqing: Northeast Petroleum University, 2011.

    Google Scholar

    [16] [16] 王海东,陈锋,欧跃强,等.页岩气水平井分簇射孔配套技术分析及应用[J].长江大学学报(自科版),2016,13(8):40-45.

    Google Scholar

    WANG Haidong, CHEN Feng, Yueqiang OU, et al. Analysis and application of cluster perforation matching technology for horizontal shale gas wells[J]. Journal of Yangtze University (Natural Science Edition), 2016,13(8):40-45.

    Google Scholar

    [17] [17] 朱秀星,薛世峰,张林,等.水平井射孔与桥塞联作管串泵送过程电缆张力计算模型[J].石油矿场机械,2013,42(3):37-41.

    Google Scholar

    ZHU Xiuxing, XUE Shifeng, ZHANG Lin, et al. Calculation model on cable tension in process of pumping down combination pipe strings of perforation and fracture plug in horizontal well[J]. Oil Mining Machinery, 2013,42(3):37-41.

    Google Scholar

    [18] [18] 朱睿恒,聂建群,张志华,等.页岩气水平井水力泵送桥塞流体力学研究[J].江汉石油职工大学学报,2020,33(1):17-19.

    Google Scholar

    ZHU Ruiheng, NIE Jianqun, ZHANG Zhihua, et al. Hydrodynamic study of hydraulic pumping bridge plug in horizontal shale gas wells[J]. 2020,33(1):17-19.

    Google Scholar

    [19] [19] 陈锋,李奔驰,唐凯,等.桥塞与套管间隙对泵送桥塞影响分析及实践[J].测井技术,2016,40(2):249-252.

    Google Scholar

    CHEN Feng, LI Benchi, TANG Kai, et al. Analysis on effect of gap between plug and case on multi cluster perforation pumping force and its application[J]. Well Logging Technology, 2016,40(2):249-252.

    Google Scholar

    [20] [20] 张跃磊,李大华,郭东鑫.页岩气储层压裂改造技术综述[J].非常规油气,2015,2(1):76-82.

    Google Scholar

    ZHANG Yuelei, LI Dahua, GUO Dongxin. Overview of shale gas reservoir fracturing technology[J]. Unconventional Oil & Gas, 2015,2(1):76-82.

    Google Scholar

  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Article Metrics

Article views(650) PDF downloads(116) Cited by(0)

Access History

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint