Geological Publishing House, Institute of Exploration Technology, Chinese Academy of Geological SciencesHost
2023 Vol. 50, No. 3
Article Contents

LI Baijun, TONG Juntao, WANG Lin, WANG Chengyong, LI Junwei and ZOU Run, . 2023. Analysis of influencing factors on the drilling efficiency of uranium geological drilling and suggestions for improvement. DRILLING ENGINEERING, 50(3): 44-53. doi: 10.12143/j.ztgc.2023.03.006
Citation: LI Baijun, TONG Juntao, WANG Lin, WANG Chengyong, LI Junwei and ZOU Run, . 2023. Analysis of influencing factors on the drilling efficiency of uranium geological drilling and suggestions for improvement. DRILLING ENGINEERING, 50(3): 44-53. doi: 10.12143/j.ztgc.2023.03.006

Analysis of influencing factors on the drilling efficiency of uranium geological drilling and suggestions for improvement

  • Uranium is an important strategic mineral resource in China. The relevant ministries and commissions of the state, China Geological Survey, China Nuclear Industry Geology Bureau, and many provinces and autonomous regions such as Sichuan, Shandong, Ningxia and Guangxi have clearly increased their investment in uranium geology in the new round of strategic action of prospecting breakthrough. In this paper, combined with the achievements of scientific research projects in production implemented by China Nuclear Industry Geology Bureau in 2021-2022, and the good process practice of some geological exploration units, the influencing factors of geological exploration and drilling production efficiency are systematically analyzed by using the calculation model of meterage per drill working-month, and suggestions on improving quality and increasing efficiency in the whole process of drilling production are put forward, including four specific suggestions, such as improving the pure drilling speed, the utilization rate of table month time, the actual drilling rate and the utilization rate of production table time,focusing on process optimization and introduction of mature tools and instruments. The suggestions and methods for improving drilling efficiency put forward in this paper have been partially verified during the implementation of scientific research projects in production in recent two years, and some achievements have been made in reducing costs, improving quality and increasing efficiency, so it is necessary to further consolidate and explore. Finally, the paper summarizes the general suggestions on production management, equipment renewal, technology citation and talent team construction to ensure the efficiency of uranium geological drilling, which provides a reference for the improvement of geological drilling technology and management.
  • 加载中
  • [1] 秦明宽,李子颖,蔡煜琦,等.对加强我国铀资源勘查“三新”突破的战略性思考[J].世界核地质科学,2022,39(3):383-398.

    Google Scholar

    QIN Mingkuan, LI Ziying, CAI Yuqi, et al. Strategic thinking on strengthening three new breakthroughs for the uranium exploration in China[J]. World Nuclear Geoscience, 2022,39(3):383-398.

    Google Scholar

    [2] [2] 李柏军,张明林,童俊涛,等.多措并举,深化改革,打造国内一流中核地质钻探铁军[J].世界核地质科学,2021,38(2):280-285.

    Google Scholar

    LI Baijun, ZHANG Minglin, Tong Juntao, et al. Build a first-class uranium exploration drilling iron army for China by multiplying measures simultaneously and deepening reform[J]. World Nuclear Geoscience, 2021,38(2):280-285.

    Google Scholar

    [3] [3] 王成.关于高质量开展“摸清家底”实施好铀矿勘查规划的思考[J].铀矿地质,2022,38(4):571-581.

    Google Scholar

    WANG Cheng. Consideration on the high quality takeover of resource inventory and implementation of uranium exploration programme[J]. Uranium Geology, 2022,38(4):571-581.

    Google Scholar

    [4] [4] 赵毓芳.钻探效率函数[J].煤田地质与勘探,1993(5):67-70.

    Google Scholar

    ZHAO Yufang. Drilling efficiency function[J]. Coal Geology & Exploration, 1993(5):67-70.

    Google Scholar

    [5] [5] 王军.降低钻探生产成本的途径[C]//《建筑科技与管理》组委会.2012年2月建筑科技与管理学术交流会论文集.北京恒盛博雅国际文化交流中心,2012:144-146.

    Google Scholar

    WANG Jun. Reduce the drilling cost of production way[C]. Organizing Committee of Building Technology and Management. Proceedings of the Academic Exchange Conference on Building Technology and Management in February 2012. Beijing Hengsheng Boya International Cultural Exchange Center, 2012:144-146.

    Google Scholar

    [6] [6] 杨冬冬,王四一.多工艺冲击回转钻进技术在硬岩钻进中的应用[J].煤矿机械,2018,39(1):112-114.

    Google Scholar

    YANG Dongdong, WANG Siyi. Application of multi-technology impact and rotary drilling technology in hard rock drilling[J]. Coal Mine Machinery, 2018,39(1):112-114.

    Google Scholar

    [7] [7] 翟育峰,张英传,田志超.中国东部海区科学钻探工程CSDP-02井钻探效率统计分析[J].探矿工程(岩土钻掘工程),2019,46(12):13-17.

    Google Scholar

    ZHAI Yufeng, ZHANG Yingchuan, TIAN Zhichao. Statistical analysis of drilling efficiency for Well CSDP-02 of the eastern sea scientific drilling project of China[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2019,46(12):13-17.

    Google Scholar

    [8] [8] 王幼凤.深孔钻探降低钻探成本方法[J].安徽地质,2015,25(1):38-41,53.

    Google Scholar

    WANG Youfeng. Analysis of method reducing cost of deep-hole drilling[J]. Geology of Anhui, 2015,25(1):38-41,53.

    Google Scholar

    [9] [9] 李生海,段志强,韩园园,等.相山地区河元背深钻CUSD2孔钻探技术[J].探矿工程(岩土钻掘工程),2015,42(10):6-10,16.

    Google Scholar

    LI Shenghai, DUAN Zhiqiang, HAN Yuanyuan, et al. Drilling technology of Heyuanbei deep drilling hole CUSD2 in Xiangshan area[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2015,42(10):6-10,16.

    Google Scholar

    [10] [10] 童俊涛,吕文军,陈明,等.广东省仁化县油洞地区铀矿钻探工程——长江1号科学深钻工艺应用研究[J].铀矿地质,2021,37(4):736-744.

    Google Scholar

    TONG Juntao, Wenjun LÜ, CHENG Ming, et al. Drilling techniques study of Changjiang No.1 scientific deep drill in Youdong area, Renhua, Guangdong[J]. Uranium Geology, 2021,37(4):736-744.

    Google Scholar

    [11] [11] 黄帆.基于纵横弯曲理论的绳索取心满眼防斜技术研究与应用[D].武汉:中国地质大学,2014.HUANG Fan. Rerearch and application of anti-deviation technology of wire-line coring assembly with packed hole stabilizers based on vertical and horizontal bending theory[D]. Wuhan: China University of Geosciences, 2014.

    Google Scholar

    [12] [12] 刘晓阳,李博.地浸砂岩型铀矿钻探现状及提高钻探效率的技术措施[J].钻探工程,2021,48(1):35-41.

    Google Scholar

    LIU Xiaoyang, LI Bo. Current status of in-situ leachable sandstone-type uranium drilling and technical measures of improving drilling efficiency[J]. Drilling Engineering, 2021,48(1):35-41.

    Google Scholar

    [13] [13] 李柏军,邹润,郭超.绳索取心技术在覆盖地层钻井中的应用[J].煤田地质与勘探,2019,47(3):217-222.

    Google Scholar

    LI Baijun, ZOU Run, GUO Chao. Application of wire line coring technique in overburden drilling[J]. Geology and Exploration, 2019,47(3):217-222.

    Google Scholar

    [14] [14] 孙德学,陈伟,张元清,等.沉积岩松软地层深孔绳索取心钻探技术实践[J].探矿工程(岩土钻掘工程),2010,37(1):16-19.

    Google Scholar

    SUN Dexue, CHEN Wei, ZHANG Yuanqing, et al. Practice of wire-line coring dring technology for deep hole in soft sedinentary rocks[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2010,37(1):16-19.

    Google Scholar

    [15] [15] 李博,刘晓阳,段志强.国外铀矿勘查钻探技术现状及发展趋势[J].世界核地质科学,2022,39(1):153-164.

    Google Scholar

    LI Bo, LIU Xiaoyang, DUAN Zhiqiang. Current situation and development trend of drilling technology for uranium exploration abroad[J]. World Nuclear Geoscience, 2022,39(1):153-164.

    Google Scholar

    [16] [16] 王海才.提高地浸砂岩型铀矿深孔钻探效率的技术措施[C]//中国地质学会探矿工程专业委员会.第二十届全国探矿工程(岩土钻掘工程)学术交流年会论文集.北京:地质出版社,2019:135-140.

    Google Scholar

    WANG Haicai. Technical measures to improve deep hole drilling efficiency of in-situ leaching sandstone uranium deposit[C]//Mineral Engineering Committee, Geological Society of China. Special for the Twentieth National Exploration Engineering (Rock & Soil Drilling and Tunneling) Academic Conference. Beijing: Geological Publishing House, 2019:135-140.

    Google Scholar

    [17] [17] 马智跃,李生海,段志强,等.相山地区如意亭深钻CUSD4孔钻探技术研究[J].地质与勘探,2019,55(2):614-621.

    Google Scholar

    MA Zhiyue, LI Shenghai, DUAN Zhiqiang,et al. Drilling technology of the Ruyiting deep drilling hole CUSD4 in the Xiangshan area, Jiangxi province[J]. Geology and Exploration, 2019,55(2):614-621.

    Google Scholar

    [18] [18] 童俊涛,吕文军,曾令,等.绿色勘查技术在广东诸广矿集区铀矿钻探工程中的应用与分析[J].世界核地质科学,2021,38(4):526-532.

    Google Scholar

    TONG Juntao, Wenjun LÜ, ZENG Ling, et al. Application and analysis on green exploration technology in uranium drilling engineering in Zhuguang metallization cluster, Guangdong[J]. World Nuclear Geoscience, 2021,38(4):526-532.

    Google Scholar

    [19] [19] 温得全,王贵,邵盛元,等.铀矿绿色勘查泥浆随钻处理装备研究[J].钻探工程,2021,48(10):88-94.

    Google Scholar

    WEN Dequan, WANG Gui, SHAO Shengyuan, et al. Development of equipment for mud treatment while drilling in uranium green exploration[J]. Drilling Engineering, 2021,48(10):88-94.

    Google Scholar

    [20] [20] 刘佳丹.探讨影响岩心钻探钻进效率的因素[J].河南科技,2014(8):33-34.

    Google Scholar

    LIU Jiadan. Discussion on the factors affecting the drilling efficiency of core drilling[J]. Henan Science and Technology, 2014(8):33-34.

    Google Scholar

    [21] [21] Б. И. Воздвиженский.提高岩心钻探效率的途径[J].国外地质勘探技术,1983(2):31-33.

    Google Scholar

    Vozdvizhensky B. I.. Ways to improve core drilling efficiency[J]. Foreign Geoexploration Technology, 1983(2):31-33.

    Google Scholar

    [22] [22] 吴开东.水刹车的使用[J].煤田地质与勘探,1984(3):72-74.

    Google Scholar

    WU Kaidong. Use of water brakes[J]. Geology and Exploration, 1984(3):72-74.

    Google Scholar

    [23] [23] 赵河江.新疆温宿、库车地区砂岩铀矿绳索取心钻探技术[J].探矿工程(岩土钻掘工程),2012,39(3):37-39,50.

    Google Scholar

    ZHAO Hejiang. Wire-line core drilling technology in sandstone uranium deposit[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2012,39(3):37-39,50.

    Google Scholar

    [24] [24] 申庆民,贾肃.提高地浸砂岩型铀矿钻探工程效益的综合技术措施[J].探矿工程(岩土钻掘工程),2007,34(S1):122-124.

    Google Scholar

    SHEN Qingmin, JIA Su. Comprehensive technical measures to improve the drilling benefit of in-situ leaching sandstone-type uranium deposits[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2007,34(S1):122-124.

    Google Scholar

    [25] [25] 李柏军,张万亮,闫纪帆,等.桥接堵漏法在通辽钱家店铀矿床地浸采铀工艺钻孔施工中的应用[J].铀矿地质,2018,34(3):180-185.

    Google Scholar

    LI Baijun, ZHANG Wanliang, YAN Jifan, et al. Application of bridge leakage plugging method in drilling construction of in-situ leaching uranium mining process of Qianjiadian uranium deposit,Tongliao[J]. Uranium Geology, 2018,34(3):180-185.

    Google Scholar

    [26] [26] 郝长旭,闫立鹏,江海宇.超长套铣筒在鄂尔多斯盆地铀矿钻探施工处理埋钻事故中的应用[J].钻探工程,2021,48(S1):108-112.

    Google Scholar

    HAO Changxu, YAN Lipeng, JIANG Haiyu. Application of the extra-long washover pipe in bit burial treatment in uranium drilling in Ordos basin[J]. Drilling Engineering, 2021,48(S1):108-112.

    Google Scholar

  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Article Metrics

Article views(447) PDF downloads(93) Cited by(0)

Access History

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint