[1]
|
王艳丽,许刘万,伍晓龙,等.大口径矿山抢险救援快速钻进技术[J].探矿工程(岩土钻掘工程),2015,42(8):1-5.
Google Scholar
WANG Yanli, XU Liuwan, WU Xiaolong, et al.Fast drilling technology of large diameter well for emergency rescue in mine[J]. Exploration Engineering (Rock & Solid Drilling and Tunneling), 2015,42(8):1-5.
Google Scholar
|
[2] |
[2] 田宏亮,张阳,郝世俊,等.矿山灾害应急救援通道快速安全构建技术与装备[J].煤炭科学技术,2019,47(5):29-33.
Google Scholar
TIAN Hongliang, ZHANG Yang, HAO Shijun, et al. Technol-ogy and equipment for rapid safety construction of emergency rescue channel after mine disaster[J]. Coal Science and Technology, 2019,47(5):29-33.
Google Scholar
|
[3] |
[3] 高广伟,张禄华.大直径钻孔救援的实践与思考——以山东平邑“12·25”石膏矿坍塌事故救援为例[J].中国应急管理,2016(3):74-75.GAO Guangwei, ZHANG Luhua. Practice and thinking of large diameter borehole rescue—Take rescue work of “12·25” gypsum mine collapse accident in Pingyi of Shandong as an example[J].China Emergency Management, 2016(3):74-75.
Google Scholar
|
[4] |
[4] 薛倩冰,梁楠,韩丽丽,等.大陆科学钻探工程技术发展动态及趋势分析[J].钻探工程,2021,48(12):1-6.
Google Scholar
XUE Qianbing, LIANG Nan, HAN Lili, et al. Development trend of continental scientific drilling technology[J]. Drilling Engineering, 2021,48(12):1-6.
Google Scholar
|
[5] |
[5] 周兢.煤矿大口径工程井钻井技术研究[J].中国煤炭地质,2016,28(1):58-62.
Google Scholar
ZHOU Jing. Study on coalmine large diameter engineering well drilling[J]. Coal Geology of China, 2016,28(1):58-62.
Google Scholar
|
[6] |
[6] 杨富春.超大口径钻孔施工技术[J].探矿工程(岩土钻掘工程),2014,41(4):25-30.
Google Scholar
YANG Fuchun. Super large diameter drilling technology[J]. Exploration Engineering (Rock & Solid Drilling and Tunneling), 2014,41(4):25-30.
Google Scholar
|
[7] |
[7] 张小连,熊亮,熊菊秋,等.大直径工程井气举反循环钻进施工常见问题与改进对策[J].中国煤炭地质,2015,27(10):49-52.
Google Scholar
ZHANG Xiaolian, XIONG Liang, XIONG Juqiu, et al. Common problems and improving measures in large diameter engineering well airlift reverse circulation drilling[J]. Coal Geology of China, 2015,27(10):49-52.
Google Scholar
|
[8] |
[8] 程林.平邑石膏矿坍塌事故5号救生孔施工工艺及钻具配置[J].探矿工程(岩土钻掘工程),2016,43(5):13-16.
Google Scholar
CHENG Lin. Construction technology of No.5 rescue hole in the collapse accident in Pingyi Gypsum Mine and the drilling tool configuration[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2016,43(5):13-16.
Google Scholar
|
[9] |
[9] 徐培元,曹伟,王立峰,等.山西中村煤矿抢险救援快速钻井施工技术[J].探矿工程(岩土钻掘工程),2016,43(10):278-280.
Google Scholar
XU Peiyuan, CAO Wei, WANG Lifeng, et al. Construction technology of rapid drilling for emergency rescue in Zhongcun Coal Mine[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2016,43(10):278-280.
Google Scholar
|
[10] |
[10] 殷其雷.潜孔锤反循环钻进技术在某水电站的试验应用[J].吉林大学学报(地球科学版),2014,44(3):961-968.
Google Scholar
YIN Qilei. Application test of DTH hammer reverse circulation drilling technique in a hydropower station[J]. Journal of Jilin University (Earth Science Edition), 2014,44(3):961-968.
Google Scholar
|
[11] |
[11] 黄勇,殷琨,朱丽红.气动潜孔锤反循环钻井最小注气量模型[J].中国石油大学学报(自然科学版),2011,35(5):65-69.
Google Scholar
HUANG Yong, YIN Kun, ZHU Lihong. The minimum gas injection volume model of pneumatic DTH hammer reverse circulation drilling[J]. Journal of China University of Petroleum (Edition of Natural Science), 2011,35(5):65-69.
Google Scholar
|
[12] |
[12] 胡振阳,白鸿雁,殷琨.潜孔锤反循环钻进技术在复杂地层中的试验研究[J].地质与勘探,2011,35(5):94-96.
Google Scholar
HU Zhenyang, BAI Hongyan, YIN Kun. Experimental researches of DTH reverse circulation drilling technique in complex strata[J]. Geology and Prospecting, 2011,35(5):94-96.
Google Scholar
|
[13] |
[13] 李亮.平邑石膏矿坍塌事故救援成功后的几点思考[J].探矿工程(岩土钻掘工程),2016,43(10):281-286.
Google Scholar
LI Liang. Discussion of Pingyi Gypsum Mine collapse accident rescue[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2016,43(10):281-286.
Google Scholar
|
[14] |
[14] 唐永志,赵俊峰,丁同福,等.复杂地质条件下大直径救生孔成孔关键技术与工艺[J].煤炭科学技术,2018,46(4):22-26,39.
Google Scholar
TANG Yongzhi, ZHAO Junfeng, DING Tongfu, et al. Key technology and technique of large diameter rescue borehole drilling under complicated conditions geological[J]. Coal Science and Technology, 2018,46(4):22-26,39.
Google Scholar
|
[15] |
[15] Murphy R R., Kravitz J., Peligren K., et al. Preliminary report: Rescue robot at Crandall Canyon, Utah mine disaster[J]. IEEE International Conference on Robotics and Automation, 2008:2205-2206.
Google Scholar
|
[16] |
[16] 石智军,刘建林,李泉新.我国煤矿区钻进技术装备发展与应用[J].煤炭科学技术,2018,46(4):1-6.
Google Scholar
SHI Zhijun, LIU Jianlin, LI Quanxin. Development and application of drilling technique and equipment in coal mining area of China[J]. Coal Science and Technology, 2018,46(4):1-6.
Google Scholar
|
[17] |
[17] 孙万兴.深井大尺寸套管固井技术在塔里木油田的应用[J].石油钻采工艺,2015(5):54-57.
Google Scholar
SUN Wanxing. Application of large size casing cementing technology about deep wells in Tarim Oilfield[J]. Oil Drilling & Production Technology, 2015(5):54-57.
Google Scholar
|
[18] |
[18] 唐永志,傅家德,李万峰,等.深部大采高超长工作面开采技术研究及展望[J].煤炭技术,2015,34(12):15-17.
Google Scholar
TANG Yongzhi, FU Jiade, LI Wanfeng, et al. Prospect and research on mining technology in ultra long deep large height fully mechanized mining face[J]. Coal Technology, 2015,34(12):15-17.
Google Scholar
|
[19] |
[19] 山东省临沂市应急办.山东平邑“12·25”石膏矿坍塌事故救援工作纪实[J].中国应急管理,2016(1):47-48.
Google Scholar
Emergency Office of Linyi, Shandong. Report on rescue work of “12·25”gypsum mine collapse accident in Pingyi of Shandong[J]. China Emergency Management, 2016(1):47-48.
Google Scholar
|
[20] |
[20] 蒋一军,叶小蓉.SD系列多功能旋挖钻机双动力系统[J].工程机械,2012,43(3):17-20,98.
Google Scholar
JIANG Yijun, YE Xiaorong. Dual power system of SD series multi-functional rotary drilling rig[J]. Construction Machinery, 2012,43(3):17-20,98.
Google Scholar
|
[21] |
[21] 沈保汉,刘富华.第六讲捷程MZ系列全套管钻孔咬合桩施工工艺(3)[J].施工技术,2006,35(10):92-93.
Google Scholar
SHEN Baohan, LIU Fuhua. The technological process of the cased secant piles of Jiecheng MZ series (3)[J]. Construction Techniques, 2006,35(10):92-93.
Google Scholar
|
[22] |
[22] 谢勋,王钰.全套管钻孔咬合桩的施工及质量控制[J].探矿工程(岩土钻掘工程),2009,36(8):76-79.
Google Scholar
XIE Xun, WANG Yu. Construction and quality control of full casing bored occlusive pile[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2009,36(8):76-79.
Google Scholar
|
[23] |
[23] 宋继伟,蒋国盛,苏宁,等.贵州省复杂地层地热深井钻探工艺[J].地质与勘探,2018,54(5):1024-1037
Google Scholar
.SONG Jiwei, JIANG Guosheng, SU Ning, et al. Drilling technology of deep geothermal wells for complex strata in Guizhou province[J]. Geology and Exploration, 2018,54(5):1024-1037
Google Scholar
|
[24] |
[24] 黄龙鹏.长输管道全位置自动焊接工艺研究[J].装备制造技术,2020(4):25-30.
Google Scholar
HUANG Longpeng. Research on full-position automatic welding technology for long distance pipelines[J]. Equipment Manufacturing Technology, 2020(4):25-30.
Google Scholar
|
[25] |
[25] 翟立新,杨建利,王雷浩.潜孔锤反循环钻进工艺在拉拉铜矿的试验应用[J].探矿工程(岩土钻掘工程),2016,43(1):66-69.
Google Scholar
ZHAI Lixin, YANG Jianli, WANG Leihao. Experimental application of DTH hammer reverse drilling technology in Lala Copper Mine[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2016,43(1):66-69.
Google Scholar
|